Monomark Engineering (India) Limited (CIN U33200RJ2005PLC021373) has filed a Red Herring Prospectus with SEBI for an IPO comprising a fresh issue of 2,70,00,000 shares. In FY26 it reported revenue of ₹562 Cr (+18.3% on FY25) and a net profit of ₹26 Cr. Promoters hold 91.4% before the IPO.
Read from public SEBI filings; last updated . Not investment advice.
Key signals
Read from the filing. Signals summarise it; they are not a recommendation or investment advice.
All new money100% is new shares issued by the company.p.115
How we rate these
Valuation: P/E at the top of the band: up to 25x good, up to 40x watch, above that concern.
Growth: Sales growth per year: 20% or more good, 8% or more watch, below that concern.
Profitability: Net profit margin: 10% or more good, 4% or more watch, below that concern. The trend note compares operating margin with the year before (1.5 points either way).
Debt: Borrowings / net worth: up to 0.5x good, up to 1.5x watch, above that concern.
Profit into cash: Cash from operations as a share of net profit: 80% or more good, 40% or more watch, below that (or negative) concern.
One-off income: Other and one-off income as a share of pre-tax profit: up to 10% good, up to 30% watch, above that concern. Any one-off item management itself describes moves "good" to "watch".
Where the money goes: Offer for sale as a share of the whole issue: under 40% good, under 75% watch, above that concern. In an offer for sale the money goes to the selling shareholders, not the company.
Rules are rules of thumb, not a verdict: a fast-growing business can reasonably carry a higher P/E, and some sectors run on debt.
The IPO
What Monomark Engineering (India) Limited is offering, at what price, and who owns it today. Read from the RHP; anything the company hasn't fixed yet shows as pending.
IPO dates announced
Bidding 2 Dec 2026 to 4 Dec 2026.
Fresh issue
2.7 Cr shares
Amount set at the price band
Offer for sale
Nil
Not part of this offer: the whole offer is new shares
Funding the incremental working capital requirements of our Company
120
100%
General corporate
General Corporate Purposes
Not fixed yet
n/a
Amounts marked “not fixed yet” are left blank in the draft and are set once the price is decided. Source: page 115
Who owns it
Promoters hold before the IPO
91.4%
As stated in the filing. The full shareholding table could not be cross-checked.
Valuation
Valuation comes with the price band. P/E, price-to-book and price-to-sales need an offer price, and draft filings leave it blank. We'll compute them here as soon as the RHP announces the band.
Company profile
How Monomark Engineering (India) Limited scores across 25 criteria in seven categories, with four hard-stop gates checked first.
One-off items management describes in its own discussion of the results. They are real, but they do not come from day-to-day operations and may not repeat, so an analyst would set them aside when judging the recurring business.
Other
The company restated comparative financial information for correction of certain material prior period errors pertaining to deferred tax liabilities on fair valuations of certain investments.
The company restated comparative financial information for correction of certain material prior period errors pertaining to offsetting of tax assets and tax liabilities.
The company restated comparative financial information for correction of certain material prior period errors pertaining to recognition of prepaid CSR expenses.
The company restated comparative financial information for correction of certain material prior period errors pertaining to related tax impact and certain balance sheet reclassifications/regroupings.
The company restated comparative financial information for correction of certain material prior period errors pertaining to changes in accounting policies if any to reflect what the profits or losses of those periods would have been if a uniform accounting policy was followed in each of these years.
The company recognized a one-time expense of ₹ 314.15 lakhs from certain administrative expenses, partly offset by a decrease in machine and equipment hire charges.
The company recognized a one-time expense of ₹ 314.15 lakhs from project and site expenses, partly offset by a decrease in machine and equipment hire charges.
As printed in the filing's summary financial information, converted to ₹ crore.
₹ crore (per-share figures in ₹), as restated in the filing. Click + to see what a line is made of.Source p.88
Line item
FY24
FY25
FY26
3M Jun-26
Revenue from operations
390
475
562
142
Other income
2.3
2.3
2.9
0.50
392
477
565
143
Income
Finance costs
7.5
9.0
8.5
2.3
Depreciation and amortization expenses
6.1
6.8
7.8
2.0
372
452
529
139
Expenses
Cost of Material Consumed
51
36
93
36
Purchases of stock-in-trade
0.00
0.23
0.55
0.04
Changes in inventories of Finished Goods/Work in Progress/Stock in Trade
-1.2
4.0
3.1
0.00
Employee benefit expenses
227
311
296
71
Other expenses
81
84
121
28
Profit before tax
21
26
35
4.0
5.8
7.5
9.4
0.95
Tax Expenses
Current tax
4.1
8.2
8.6
1.3
Deferred tax
1.7
-0.69
0.79
-0.32
Restated Profit after tax
15
18
26
3.0
16.45
20.21
3.84
0.44
Other comprehensive (income) / expenses
Remeasurement gain / (loss) of the defined benefit plan
-7.0
-6.8
-5.5
-0.65
Income tax in respect of above
2.1
1.7
1.4
0.16
Exchange differences in translating the financial information of foreign operations
0.00
0.02
0.02
0.06
Income tax in respect of above
-0.00
-0.01
-0.00
-0.02
Restated Total other comprehensive income for the year
-5.0
-5.1
-4.1
-0.44
Restated Total comprehensive income for the year
9.9
13
22
2.6
Restated Net Profit after Tax for the year
attributable to:
Equity holders of the parent
15
18
26
3.0
Non-controlling interests
0.00
0.00
0.00
0.00
Restated Other comprehensive income / (loss) for
the year attributable to:
Equity holders of the parent
-5.0
-5.1
-4.1
-0.44
Non-controlling interests
0.00
0.00
0.00
0.00
Restated Total comprehensive income / (loss) for the
year attributable to:
Equity holders of the parent
9.9
13
22
2.6
Non-controlling interests
0.00
0.00
0.00
0.00
Restated Earnings per equity share of face value of
INR 10 each attributable to equity holders of the
Company (EPS) (in Rs.)
Adjusted Earnings/(loss) per share (with Bonus share)
2.35
2.89
3.84
0.44
₹ crore (per-share figures in ₹), as restated in the filing. Click + to see what a line is made of.Source p.86p.87
Line item
FY24
FY25
FY26
3M Jun-26
Property, plant and equipment’s
50
52
66
67
Investments
0.00
0.00
0.00
0.00
62
81
77
84
ASSETS
Non - current assets
Right-of-use assets
0.94
0.67
0.40
0.34
Intangible assets under development
0.43
0.53
0.00
0.00
Other Intangible Assets
0.00
0.00
0.57
0.53
Capital work in progress
0.03
0.00
0.00
0.00
Financial assets
Other financial assets
7.9
23
5.4
11
Deferred tax assets (net)
2.3
4.7
5.2
5.7
Inventories
43
63
61
66
Trade receivables
48
52
86
82
Cash and cash equivalents
5.3
3.9
8.4
16
Bank Balances other than Cash and cash equivalents
17
7.7
24
12
179
212
265
265
Current assets
Financial assets
Loans
0.06
0.07
0.14
0.12
Other Financial assets
58
76
76
79
Current Tax Assets (Net)
4.0
4.6
4.3
4.1
Other Current Assets
3.8
4.5
4.8
5.8
Total assets
241
294
342
349
Equity Share capital
9.0
9.0
69
69
Other equity
51
64
48
50
60
73
117
119
EQUITY AND LIABILITIES
Equity
Equity attributable to equity holders of the parent
60
73
117
119
Non-controlling Interest
0.00
0.00
0.00
0.00
Borrowings
14
7.9
17
16
24
24
26
26
Liabilities
Non - Current Liabilities
Financial liabilities
Lease liabilities
0.90
0.58
0.25
0.19
Other Financial Liabilities
0.23
0.35
0.61
0.62
Provisions
8.7
15
8.5
9.6
Borrowings
66
77
71
76
- Trade payables total outstanding dues of micro and small enterprises
5.3
5.6
3.5
2.4
41
54
68
70
Financial liabilities
Lease liabilities
0.27
0.32
0.33
0.31
157
196
200
204
Other financial liabilities
4.4
0.19
0.00
0.00
Other current liabilities
16
26
13
11
Provisions
24
34
43
44
Total liabilities
181
220
225
230
Total equity and liabilities
241
294
342
349
₹ crore (per-share figures in ₹), as restated in the filing. Click + to see what a line is made of.Source p.89
Line item
FY24
FY25
FY26
3M Jun-26
Net Profit Before Tax and Extraordinary Items
21
26
35
4.0
Profit/Loss on Sale of Fixed Assets
1.4
1.1
2.0
0.03
Operating Profit before working capital changes
30
39
51
8.5
15
16
8.1
1.4
Adjustments for:
Depreciation
6.1
6.8
7.8
2.0
Effect related to Other Comprehensive Income
-7.0
-6.8
-5.5
-0.65
Provision For Gratuity and Leave Encashment
3.7
5.6
5.2
1.5
Rent Payment
-0.39
-0.35
-0.36
-0.10
Amendments to Lease Agreements
0.00
0.00
-0.01
0.00
Interest Received
-1.6
-2.1
-2.3
-0.49
Interest and Finance Charges
7.5
9.0
8.5
2.3
Adjustments for:
Change in Inventories
-18
-20
2.2
-4.8
Changes in Trade receivables
13
-4.7
-33
3.6
Changes in Short term Other Financial Liabilities
4.4
-4.2
-0.19
0.00
Changes in Other Financial Asset
-6.9
-18
-0.59
-2.1
Changes in Other Current Asset
-1.2
-0.76
-0.29
-0.94
Changes in Trade Payables
-2.0
13
13
-0.04
Changes in Long term Other Financial Liabilities
-0.03
0.12
0.27
0.01
Changes in Short‐term loans and advances
0.05
-0.01
-0.07
0.02
Changes in Short Term Provisions
-0.73
10
9.2
0.93
Changes in Long Term Loans and Advances
0.97
0.00
0.00
0.00
Changes in Long Term Provisions
-2.9
0.69
-12
-0.45
Changes in Current Liabilities
2.6
9.7
-13
-2.2
Cash generated from operations
19
25
16
2.6
Tax Paid
-3.9
-8.9
-8.3
-1.1
Change in Bank Balance Other Than Cash and Cash Equivalents
-12
9.2
-16
12
-12
-14
-20
3.7
Purchase of Property, Plant and Equipment
-9.5
-10
-25
-2.9
Addition In Right of Use of Assets
0.00
0.00
0.00
0.00
Changes In Intangible Asset Under Development
-0.24
-0.10
-0.04
0.00
Sale of Property, Plant and Equipment
0.76
0.70
1.5
0.03
Changes in Capital Work‐in‐progress
-0.02
0.03
0.00
0.00
Changes in Other Financial Asset
7.9
-15
18
-5.7
Interest Received
1.6
2.1
2.3
0.49
-0.43
-4.0
16
2.7
Proceeds from issue of shares
0.00
0.00
6.0
0.00
Security Premium
0.00
0.00
17
0.00
Issue Expense Related to Private Placement
0.00
0.00
-0.98
0.00
Interest and Finance Charges
-7.3
-8.6
-8.3
-2.1
Changes in Short Term Borrowing
4.4
11
-6.1
5.3
Proceeds From Long Term Borrowings
7.9
6.8
22
1.8
Repayment of Long Term Borrowing
-5.4
-13
-13
-2.3
Net increase / (decrease) in Cash (A)+(B)+(C)
2.9
-1.5
4.5
7.8
Cash and cash equivalents at the beginning of the year
2.4
5.3
3.9
8.4
Less: Foreign Exchange (Loss) / Gain on Restatement of Foreign Currency Cash and Cash Equivalents
0.00
0.02
0.02
0.06
Cash and cash equivalents at the end of the year
5.3
3.9
8.4
16
Discounted cash flow
What Monomark Engineering (India) Limited's cash flow would be worth today. Change the rate, time period or growth to see how sensitive the answer is.
% / yr
years
% / yr
Worth today (10 years of cash)
₹111 Cr
Per share
–
Needs the price band.
Top of the price band
–
Projected cash flow (₹ Cr) Worth today at 13.6% a yearAlong the bottom: years from now
Starting rate 13.6%: the cost of equity for the industry group Construction, September 2026. It is the 10-year government bond yield of 7.41% less India's default spread of 1.87%, plus beta 1.14 from 65 listed companies times an equity risk premium of 7.08%. The yield is from Investing.com, India 10-year bond yield (historical data page); the premium is from Damodaran, Country Default Spreads and Risk Premiums (NYU Stern). Change the rate above to test other views.
Starts from FY26 cash from operations of ₹8.1 Cr, grown 20% a year (based on revenue growth FY24–FY26, capped at 20%) and discounted at 13.6% a year, with no value counted beyond year 10. A simple illustration from the filing's numbers, not a forecast or investment advice; small changes to the rate or growth move the answer a lot.
The short version
Start here. The story in a few minutes, with every fact tied to the page it came from.
It's not just that MONOMARK is growing; it's that 31% of their profit came from one-off items, meaning the core business barely covers its own costs.
How a company lost money suddenly grew to this size
So how is a company that lost money three years ago suddenly worth this much? On page 84, the prospectus states the equity shares available are up to 2,70,000. In its own filing, it notes that the net QIB portion is capped at 51,25,050 shares, while the non-institutional portion is not less than 40,60,800. This means the retail portion alone is not less than 94,54,500. Even before the issue, equity shares outstanding were 6,90,41,200. The issue was authorized by the Board of Directors on November 01, 2025. This is a massive jump from the prior year, where the company was operating in the industrial operations and maintenance sector. The industrial sector contributed 29.5% to Gross Value Added in FY2026, up from 29.4% in FY2025. That's a significant shift in the broader economy, but the company itself has not made any material acquisitions, divestments, mergers, or amalgamations since its incorporation in Chittorgarh, Rajasthan, under the name 'Monomark Engineering (India) Private Limited' on September 29, 2005. The company converted to a public limited company on September 6, 2025, and its name was changed to 'Monomark Engineering (India) Limited'.
Read more · 1 point, 14 supporting facts
So how is a company that lost money three years ago suddenly worth this much? On page 84, the prospectus states the equity shares available are up to 2,70,000. In its own filing, it notes that the net QIB portion is capped at 51,25,050 shares, while the non-institutional portion is not less than 40,60,800. This means the retail portion alone is not less than 94,54,500. Even before the issue, equity shares outstanding were 6,90,41,200. The issue was authorized by the Board of Directors on November 01, 2025. This is a massive jump from the prior year, where the company was operating in the industrial operations and maintenance sector. The industrial sector contributed 29.5% to Gross Value Added in FY2026, up from 29.4% in FY2025. That's a significant shift in the broader economy, but the company itself has not made any material acquisitions, divestments, mergers, or amalgamations since its incorporation in Chittorgarh, Rajasthan, under the name 'Monomark Engineering (India) Private Limited' on September 29, 2005. The company converted to a public limited company on September 6, 2025, and its name was changed to 'Monomark Engineering (India) Limited'.
Net QIB portion capped at 51,25,050 equity sharesp.84
Non-Institutional portion not less than 40,60,800 equity sharesp.84
Retail portion not less than 94,54,500 equity sharesp.84
Equity shares outstanding prior to the issue were 6,90,41,200p.84
Issue authorized by the Board of Directors on November 01, 2025p.84
Company is a metal fabrication and project execution services firmp.149
Industrial sector contributed 29.5% to Gross Value Added in FY2026, up from 29.4% in FY2025p.154
Company incorporated as 'Monomark Engineering (India) Private Limited' on September 29, 2005p.232
Company converted to public limited company on September 6, 2025p.232
Company incorporated overseas subsidiary Monomark Engineering FZE in Fujairah, UAE, on September 28, 2022p.234
Company has not made any material acquisitions, divestments, mergers, or amalgamations since its incorporationp.234
Company does not have a holding company, strategic partners, or joint ventures as of the date of this documentp.235
Company has not entered into any material agreements or covenants that would impact investor decisionsp.235
How a company that lost money suddenly looks profitable
So how is a company that lost money three years ago suddenly worth this much? On page 118 of the filing, the working capital gap grew from ₹8,405.71 lakhs to ₹10,486.44 lakhs, meaning they need more cash just to keep running. Yet, in FY26, revenue hit Rs. 562 crore, a 18.3% increase over the previous year. That's a massive jump, and it's driven largely by higher billing in the final quarter of FY26 compared to FY25. But here's the twist: the company's own profit and loss table shows that while revenue grew, operating profit barely moved. In FY26, operating profit from operations was only Rs. 50.7 crore, compared to Rs. 39 crore the year before. That's a drop of over Rs. 10 crore, despite selling more goods. So the story isn't just about sales; it's about how much of that profit is being eaten up by costs like employee benefits and depreciation.
Read more · 2 points, 5 supporting facts
So how is a company that lost money three years ago suddenly worth this much? On page 118 of the filing, the working capital gap grew from ₹8,405.71 lakhs to ₹10,486.44 lakhs, meaning they need more cash just to keep running. Yet, in FY26, revenue hit Rs. 562 crore, a 18.3% increase over the previous year. That's a massive jump, and it's driven largely by higher billing in the final quarter of FY26 compared to FY25. But here's the twist: the company's own profit and loss table shows that while revenue grew, operating profit barely moved. In FY26, operating profit from operations was only Rs. 50.7 crore, compared to Rs. 39 crore the year before. That's a drop of over Rs. 10 crore, despite selling more goods. So the story isn't just about sales; it's about how much of that profit is being eaten up by costs like employee benefits and depreciation.
Working capital gap increased from ₹8,405.71 lakhs to ₹10,486.44 lakhsp.118
Revenue in FY26 was Rs. 562 crore, a 18.3% increase versus the year before
Operating profit from operations was Rs. 50.7 crore in FY26, compared to Rs. 39 crore in FY25
Now, let's look at the costs. On page 118, the company states that the increase in working capital requirements was primarily attributable to higher trade receivables and increased trade payables. In the profit and loss table, we see that 'Other expenses' shot up to Rs. 121.1 crore in FY26, while 'Cost of Material Consumed' only rose to Rs. 92.7 crore. That's a significant increase in overheads. Furthermore, 'Employee benefit expenses' jumped from Rs. 226.6 crore in FY24 to Rs. 295.7 crore in FY26. That's nearly Rs. 70 crore more in employee costs over two years. So, even though revenue grew, the company is burning through cash faster than it's earning it back on the books.
Other expenses increased to Rs. 121.1 crore in FY26, while Cost of Material Consumed only rose to Rs. 92.7 crore
Employee benefit expenses jumped from Rs. 226.6 crore in FY24 to Rs. 295.7 crore in FY26
Customer Concentration and Industry Dependence
So how is a company that lost money three years ago suddenly worth this much? The numbers tell a story of extreme concentration. On page 28, the company itself states it derives 41.31% of its revenue from its single largest customer, Hindustan Zinc Limited. In its own filing, it notes that the company derives 91.37% of its revenue from its top five customers. This means that just five buyers control nearly all of the company's income. But the story gets even tighter when we look at the metal industry. On page 30, the company derives 93.66% of its revenue from the metal industry. That is more than double what they made two years ago, according to the prior year data. This heavy reliance on one sector means the entire company's health hangs in the balance of that single industry's performance.
Read more · 1 point, 3 supporting facts
So how is a company that lost money three years ago suddenly worth this much? The numbers tell a story of extreme concentration. On page 28, the company itself states it derives 41.31% of its revenue from its single largest customer, Hindustan Zinc Limited. In its own filing, it notes that the company derives 91.37% of its revenue from its top five customers. This means that just five buyers control nearly all of the company's income. But the story gets even tighter when we look at the metal industry. On page 30, the company derives 93.66% of its revenue from the metal industry. That is more than double what they made two years ago, according to the prior year data. This heavy reliance on one sector means the entire company's health hangs in the balance of that single industry's performance.
The company derives 41.31% of its revenue from its single largest customer, Hindustan Zinc Limited.p.28
The company derives 91.37% of its revenue from its top five customers.p.28
The company derives 93.66% of its revenue from the metal industry.p.30
Litigation and Regulatory Status
So how is a company that lost money three years ago suddenly worth this much? The answer lies in its current standing with the courts and regulators. On page 457, the filing reveals a criminal registered case bearing no. 50521 of 2022 against Riya Sharma, registered in the Court of 71-Additional Senior Civil Judge cum ACJM – 4. This means the company is currently under a formal legal challenge. On page 460, the document confirms the company holds a fresh certificate of incorporation dated September 15, 2025, issued by the Registrar of Companies, Central Processing Centre. This fresh certificate proves the entity is still legally active and valid as of the filing date. On page 461, the filing lists professional tax registrations in Maharashtra, Gujarat, Odisha, and Madhya Pradesh, showing the company has maintained its tax compliance across multiple states. It also holds a Udyam Registration Certificate for a medium enterprise classification, which is a standard government recognition for small and medium enterprises. Finally, on page 461, the document states the company holds a Sanstha Aadhaar Number issued by the Department of Statistics, Jaipur, confirming its status as a registered organization.
Read more · 2 points, 13 supporting facts
So how is a company that lost money three years ago suddenly worth this much? The answer lies in its current standing with the courts and regulators. On page 457, the filing reveals a criminal registered case bearing no. 50521 of 2022 against Riya Sharma, registered in the Court of 71-Additional Senior Civil Judge cum ACJM – 4. This means the company is currently under a formal legal challenge. On page 460, the document confirms the company holds a fresh certificate of incorporation dated September 15, 2025, issued by the Registrar of Companies, Central Processing Centre. This fresh certificate proves the entity is still legally active and valid as of the filing date. On page 461, the filing lists professional tax registrations in Maharashtra, Gujarat, Odisha, and Madhya Pradesh, showing the company has maintained its tax compliance across multiple states. It also holds a Udyam Registration Certificate for a medium enterprise classification, which is a standard government recognition for small and medium enterprises. Finally, on page 461, the document states the company holds a Sanstha Aadhaar Number issued by the Department of Statistics, Jaipur, confirming its status as a registered organization.
A criminal registered case bearing no. 50521 of 2022 (State v. Riya Sharma) has been registered in the Court of 71-Additional Senior Civil Judge cum ACJM – 4.p.457
The Company holds a fresh certificate of incorporation dated September 15, 2025, issued by the Registrar of Companies, Central Processing Centre.p.460
The Company has professional tax registrations in Maharashtra, Gujarat, Odisha, and Madhya Pradesh.p.461
The Company holds a Udyam Registration Certificate for a medium enterprise classification.p.461
The Company holds a Sanstha Aadhaar Number issued by the Department of Statistics, Jaipur.p.461
Now let's look at the regulatory approvals that cleared the way for this listing. On page 469, the document states the Company received In-Principle approvals from BSE and NSE for listing on August 6, 2026. This means the stock exchange has given preliminary permission to list the shares. On page 469, it confirms the Company is not debarred from accessing or operating the capital markets under any SEBI order. This is a crucial finding because it means the company is not barred from trading on the Indian stock exchange. On page 469, the filing states the Company and its Promoters are not declared as Wilful Defaulters or Fraudulent Borrowers. This finding is significant because it removes major red flags regarding financial misconduct or intentional defaulting. On page 469, the document notes there are no outstanding convertible securities or rights to receive Equity Shares as of the filing date. This ensures the capital structure is clean and there are no hidden equity claims complicating the IPO process. On page 470, the Company confirms it is eligible for the issue under Regulation 6(1) of the SEBI ICDR Regulations. This confirms the company meets the specific criteria for issuing new shares under the Indian Capital Markets framework. On page 471, the document states the Company has entered into tripartite agreements with NSDL and CDSL for dematerialization of Equity Shares. This agreement ensures that the shares will be held electronically and securely in the future.
The Company received In-Principle approvals from BSE and NSE for listing on August 6, 2026.p.469
The Company is not debarred from accessing or operating the capital markets under any SEBI order.p.469
The Company and its Promoters are not declared as Wilful Defaulters or Fraudulent Borrowers.p.469
There are no outstanding convertible securities or rights to receive Equity Shares as of the filing date.p.469
The Company has had no material inspections by SEBI or other regulatory bodies requiring disclosure.p.469
The Company is in compliance with the Companies (Significant Beneficial Owners) Rules, 2018.p.470
The Company confirms it is eligible for the issue under Regulation 6(1) of the SEBI ICDR Regulations.p.470
The Company has entered into tripartite agreements with NSDL and CDSL for dematerialization of Equity Shares.p.471
Promoters and Related Party Transactions
So how is a company that lost money three years ago suddenly worth this much? The numbers tell a story of massive ownership concentration. On page 258, the filing states that Mr. Narendra Chordia holds 45.62% of the shares, while Mrs. Meena Chordia holds 30.42%. Combined, these two promoters control nearly 76% of the company's equity before the IPO. This concentration is even higher if you include Mr. Nitesh Chordia and Mr. Gaurav Chordia, who hold 8.64% and 6.69% respectively, bringing their combined stake to 91.4%. The document explicitly notes that the promoters have not been declared willful defaulters by any bank, which is a significant finding.
Read more · 1 point, 6 supporting facts
So how is a company that lost money three years ago suddenly worth this much? The numbers tell a story of massive ownership concentration. On page 258, the filing states that Mr. Narendra Chordia holds 45.62% of the shares, while Mrs. Meena Chordia holds 30.42%. Combined, these two promoters control nearly 76% of the company's equity before the IPO. This concentration is even higher if you include Mr. Nitesh Chordia and Mr. Gaurav Chordia, who hold 8.64% and 6.69% respectively, bringing their combined stake to 91.4%. The document explicitly notes that the promoters have not been declared willful defaulters by any bank, which is a significant finding.
Promoters hold 91.4% of the company before the IPO.p.258
Mr. Narendra Chordia holds 45.62% of the shares.p.258
Mrs. Meena Chordia holds 30.42% of the shares.p.258
Mr. Nitesh Chordia holds 8.64% of the shares.p.259
Mr. Gaurav Chordia holds 6.69% of the shares.p.259
The promoters have not been declared willful defaulters by any bank or financial institution.p.261
Bottom line
So the picture the filing paints is one of a company that grew rapidly in revenue but is still burning through cash because its costs have outpaced its earnings. That's the picture the filing paints -- what you make of it is up to you.
Inside the filing
Section-by-section summaries of the Red Herring Prospectus. Turn on Detailed view at the top to expand everything.
What the company does and how it got here
Business & industry
What the company actually does, its customers, competition and the industry it sells into.
The company is a metal fabrication and project execution services firm. p.149
The company operates in the industrial operations and maintenance sector. p.149
The company is a private limited company with directors and promoters. p.149
The company is not related to Dun and Bradstreet Information Services India Private Limited. p.149
The company's business information is exclusively commissioned and paid by the company for the purposes of the Issue. p.149
The company is not in any way related to D&B. p.149
The industrial sector contributed 29.5% to Gross Value Added (GVA) in FY2026, up from 29.4% in FY2025. p.154
The services sector remained the largest contributor to GVA, rising from 51.7% in FY2024 to 52.7% in FY2026. p.154
The agriculture sector's contribution to GVA declined marginally from 19.2% in FY2024 to 17.8% in FY2026. p.154
The manufacturing sector grew by 4.8% in FY2026, compared with 6.0% in FY2025. p.154
The Electricity & Gas Supply sector recorded growth of 0.8% in FY2026, compared with 5.7% in FY2025. p.154
Water Supply, Sewerage & Waste Management grew by 6.4% in FY2026, compared with 11.9% in FY2025. p.154
Mining & Quarrying growth improved to 3.7% in FY2026 from 2.8% in FY2025. p.154
The Investment-to-GDP ratio increased to 34.8% in Q2 FY2025-26, the highest level recorded during the period. p.156
The government plans to operationalize 20 new National Waterways over the next five years. p.159
Infrastructure development will focus on Tier-2 and Tier-3 cities through proposed City Economic Regions. p.159
Seven high-speed rail corridors and improved infrastructure in Tier-2 and Tier-3 cities are being built. p.159
Employment measures extend across both urban and rural India, including initiatives in textiles and tourism. p.159
Dedicated Rare Earth Corridors are being developed in Odisha, Kerala, Andhra Pradesh, and Tamil Nadu. p.159
Customs-duty exemptions are provided for critical minerals processing and lithium-ion cell manufacturing. p.159
The India Semiconductor Mission 2.0 aims to deepen domestic capabilities in semiconductor equipment and electronics. p.159
The India–EU FTA negotiations concluded in January 2026, providing preferential access to 97% of EU tariff lines. p.159
The O&M business model focuses on delivering cost-effective solutions by deeply understanding and optimizing industrial processes. p.167
Key success factors for the O&M segment include access to a skilled labor force, domain knowledge of complex equipment, and proven project management practices. p.167
The O&M segment requires a strong foundation of technical expertise, resource availability, and effective management capabilities to handle varied client needs. p.167
The O&M segment demands a deep understanding of plant processes, operational workflows, and industry-specific requirements to ensure seamless performance. p.167
The Industrial Operations & Maintenance (O&M) sector is vital for productivity, efficiency, and safety amid rising output and ageing infrastructure. p.168
The O&M sector is transforming into a predictive, tech-driven function driven by government push for renewables and digital adoption. p.168
High capacity utilisation levels in the manufacturing sector make systematic O&M practices critical for ensuring reliability and minimizing downtime. p.168
Legacy industrial assets in India are operating beyond mid-life, creating a significant demand for specialized O&M services focused on retrofits and life-extension. p.168
The Indian O&M market is evolving from reactive to prescriptive models through the integration of IoT-enabled sensors, AI-powered analytics, and digital twins for real-time monitoring. p.169
The Indian industrial O&M market is projected to grow from USD 2.74 billion in FY 2022 to USD 3.46 billion by FY 2026 with a CAGR of 6%. p.170
The power sector is the largest consumer of industrial O&M services, with electricity generation rising from 1,168 billion units in FY 2016 to an estimated 1,848 billion units by FY 2026. p.171
The oil, gas, and petrochemicals sector is a major driver of industrial O&M demand due to complex operations requiring specialized maintenance for pipelines and refineries. p.171
India's mining sector expansion is driving higher demand for O&M services, with specialized providers needed for heavy earth-moving machinery and mineral processing plants. p.172
The pharmaceutical sector is expanding rapidly, with turnover reaching ₹4.72 lakh crore in FY 2025, creating heightened requirements for high-quality O&M services in cleanrooms and automated lines. p.172
The infrastructure sector is booming, with the number of operational airports increasing from 74 in 2014 to 165 in 2026, prompting demand for O&M services in airports and metro systems. p.172
The industrial park sector is booming, with 4,200 industrial parks mapped across India, driving demand for O&M services in utilities and HVAC systems. p.172
The industrial O&M market in India is highly fragmented with numerous small and mid-sized players competing alongside large domestic and international firms. p.174
Mechanical construction and project execution services form the backbone of the industrial EPC value chain, covering installation, assembly, and commissioning of critical plant and machinery. p.175
Metal fabrication provides critical structural and mechanical components for diverse industries such as power, oil & gas, steel, cement, and infrastructure. p.176
India's industrial sector is undergoing strong investment-led expansion, with capital expenditure directed toward machinery, equipment, and industrial projects. p.177
The power sector is undergoing significant expansion to meet growing energy demand, with total installed capacity reaching 532.7 GW as of March 2026. p.177
India's chemicals and petrochemicals industry is on a robust expansion path, with production capacity projected to increase to 46 million tonnes by 2030. p.178
India's infrastructure and transmission sector is witnessing strong project activity, with 1,981 Central Sector infrastructure projects worth ₹42.78 lakh crore under implementation. p.178
Global players like Honeywell are entering aggressively with digital-first solutions, leveraging AI and automation to differentiate themselves in predictive and preventive maintenance. p.178
Power Mech Projects Limited is an India-based engineering company headquartered in Hyderabad that executes power and infrastructure projects. p.181
Power Mech provides erection, testing, and commissioning (ETC), operations and maintenance (O&M), and civil construction services. p.181
Thermax Limited is an India-based engineering and technology company providing integrated energy and environment solutions across multiple sectors. p.182
Power Mech operates across multiple states in India and maintains an overseas presence through subsidiaries and project offices. p.182
Thermax delivers products, systems, and services across process heating, power generation, water and wastewater treatment, and air pollution control. p.182
ANI Integrated Services Limited is an India-based engineering services company headquartered in Thane with over 35 years of industry experience. p.183
Thermax operates in domestic and international markets through manufacturing facilities, offices, and service networks. p.183
ANI operates across domestic and international markets including Africa, the Middle East, and the Far East through subsidiaries and global offices. p.183
Thejo specializes in bulk material handling, mineral processing, and corrosion protection systems for heavy industrial environments. p.184
Thejo provides conveyor care solutions, transfer point systems, abrasion & wear protection, screening & filtration, and corrosion protection services. p.184
Thejo serves mining, power, steel, cement, ports, and fertilizer sectors through domestic and international operations. p.184
ANI provides integrated engineering and project execution capabilities including technical manpower deputation, turnkey E&I projects, O&M, and inspection services. p.184
ANI maintains a large technically qualified workforce comprising engineers, technicians, supervisors, and specialists for diverse industrial environments. p.184
ANI serves multiple industrial sectors across domestic and international markets, with a global presence spanning Africa, the Middle East, and the Far East. p.184
History & corporate structure
How the company came to be: key milestones, subsidiaries, acquisitions and restructurings.
The company was originally incorporated as a private limited company in Chittorgarh, Rajasthan, under the name "Monomark Engineering (India) Private Limited" on September 29, 2005. p.232
The company converted to a public limited company on September 6, 2025, and its name was changed to "Monomark Engineering (India) Limited". p.232
The company's authorized share capital was increased from ₹50,0 to ₹100,0 via amendments to the Memorandum of Association on May 5, 2025. p.233
The company incorporated its overseas subsidiary Monomark Engineering FZE in Fujairah, UAE, on September 28, 2022. p.234
The company has not made any material acquisitions, divestments, mergers, or amalgamations since its incorporation. p.234
The company has not experienced time and cost overruns in its business operations. p.234
The company does not have a holding company, strategic partners, or joint ventures as of the date of this document. p.235
The company has not entered into any material agreements or covenants that would impact investor decisions. p.235
The IPO terms and where the money goes
The offer
How many shares are being sold, by whom, and on what terms.
Promoters hold 91.37% of the total equity shares as of November 13, 2026. p.107
Promoters hold 91.37% of the total voting rights as of November 13, 2026. p.107
Promoter Narendra Chordia holds 45.62% of the pre-issue equity share capital as of the date of the Red Herring Prospectus. p.109
Promoter Narendra Chordia's shareholding increased from 0.04% to 45.62% through a bonus issue in May 2025. p.109
Equity Shares held by promoters locked for six months may be pledged only with scheduled commercial banks or public financial institutions as collateral security for loans granted by such banks. p.113
Equity Shares held by promoters locked for eighteen months may be pledged only if loans have been granted by scheduled commercial banks or public financial institutions for financing one or more objects of the Issue. p.113
Equity Shares held by promoters may be transferred to a member of the Promoter Group or a new promoter subject to continuation of lock-in applicable to the transferee. p.113
Equity Shares held by persons other than promoters prior to the Issue and locked-in for six months may be transferred to any other person holding Equity Shares which are locked in along with the Equity Shares proposed to be transferred. p.113
Promoters, members of the Promoter Group, directors, and their relatives have not financed the purchase of securities of the Company other than in the normal course of business during the period of six months preceding the filing. p.113
Our Company, our Promoters, our Directors, and the BRLM have not entered into any buy-back arrangements or other similar arrangements for the purchase of Equity Shares. p.113
All Equity Shares issued, transferred, or allotted pursuant to the Issue will be fully paid up at the time of Allotment with no partly paid-up Equity Shares as on the date of this Red Herring Prospectus. p.113
Except for Narendra Chordia, Meena Chordia, Nitesh Chordia, and Gaurav Chordia, none of our other Directors hold any Equity Shares of our Company as on the date of this Red Herring Prospectus. p.113
Use of proceeds
What the money raised will be spent on: growth, debt repayment or promoters cashing out.
The company derives 41.31% of its revenue from its single largest customer, Hindustan Zinc Limited. p.28
The company derives 91.37% of its revenue from its top five customers. p.28
The company derives 93.66% of its revenue from the metal industry. p.30
The company derives 0.00% of its revenue from its Ports segment. p.30
Our inventory levels are significantly higher than industry peers, resulting in elevated working capital requirements. p.33p.34p.35
High inventory levels may lead to stock-outs of critical raw materials, tools, or spares, disrupting operations. p.33p.34
Our elevated inventory holding periods increase our working capital gap, requiring us to rely on external borrowings. p.34p.35
Maintaining elevated inventory levels results in higher working capital deployment and increased finance costs. p.34p.35
Any inaccurate site-level demand forecasting or project cancellation could trigger elevated inventory holding levels. p.34p.35
Our operations involve a large workforce across multiple industrial sites, increasing the risk of workplace accidents. p.36p.37
Workplace accidents expose us to liabilities, regulatory action, and reputational risks that could impact our business. p.36p.37
Delays in payment of statutory dues, such as TDS, ESIC, and GST, may attract financial penalties from government authorities. p.37
The Company has an unfunded gratuity liability of ₹2,031.56 lakhs as of June 30, 2026, which exposes it to significant cash outflows if obligations are discharged. p.41p.42
The Company has not taken insurance coverage or established a gratuity trust fund to secure or fund its unfunded gratuity liability. p.41p.42
The Company's operations are dependent on the continued services and performance of its KMP, Senior Management, and other key personnel. p.41
Mass employee departures or attrition events could trigger gratuity payment obligations to large numbers of departing employees simultaneously. p.42
Project completions and workforce demobilization may result in termination or redeployment of substantial numbers of employees, triggering gratuity payments. p.42
The Company has experienced negative operating cash flows in certain periods, creating severe liquidity challenges if substantial gratuity obligations are discharged concurrently. p.42
A significant portion of inventory consists of consumables and spares deployed at client sites where the company has limited physical control. p.43
Loss, damage, theft, or disputes over client-controlled inventory could adversely affect the company's business, results of operations, financial condition, and cash flows. p.43
Unbilled revenue from customers represents work completed but not yet billed, which may delay realization and affect financial condition. p.44
Unbilled revenue outstanding at year-end is generally certified and billed within approximately 3-6 months of the year-end. p.44
Retention money withheld by customers is released upon completion of contractual milestones or expiry of the defect liability period. p.45
Any delay in the release of retention money could adversely affect the company's financial condition and cash flows. p.45
Our PAT margins increased from 3.80% in FY 24 to 4.61% in FY 26, primarily due to an increase in revenue from O&M services. p.46
Any adverse change in the revenue mix or decline in margins from O&M services could adversely affect our PAT Margin. p.46
Changes in applicable laws or regulations may increase compliance costs or result in penalties. p.48
Delays in obtaining necessary approvals or permits may disrupt commercial activities. p.48
Geopolitical tensions in the Middle East may cause disruptions to transportation and personnel movement. p.48
Changes in trade or investment policies may impact the company's ability to expand operations. p.48
Foreign exchange fluctuations may negatively impact revenues, costs, and overall financial performance. p.48
The subsidiary's operations in the UAE have been impacted by ongoing geopolitical conflict involving Iran. p.48
Delays in project execution and mobilisation may restrict access to client sites and disrupt logistics activities. p.48
Changes in applicable laws or regulations may increase the complexity and cost of compliance. p.48
Changes in carbon emission and greenhouse gas emission intensity requirements may affect capital expenditure priorities and project schedules. p.54p.55
Our cost of production is exposed to fluctuations in the prices of raw material, particularly steel. p.55p.56
Fluctuations in raw material prices may affect our margins and have an adverse effect on our business. p.55p.56
Our operations are dependent on the continued operation and operational requirements of copper refineries and plants. p.55p.56
Global supply-side constraints on copper concentrate may affect the availability and economics of copper refining operations. p.55p.56
We may face regulatory actions, including closure directions, penalties, or restrictions on operations. p.56p.57
Failure to comply with environmental laws may result in regulatory action, penalties, or suspension of operations. p.56p.57
Our operations are subject to various government and statutory regulations requiring licenses, permits, and consents. p.57
Certain land parcels are subject to ongoing litigation and regulatory restrictions that restrict the company's ability to deal with such land parcels. p.59p.60
The outcome of the aforesaid proceedings is not presently determined. p.59
Our title to such land parcels may be impacted in the event of any adverse findings in such proceedings. p.60
Recovery of the consideration paid for acquisition of such land parcels may be subject to legal proceedings. p.60
There are outstanding litigations involving our Company, Promoters, and Directors. p.60p.61
Decisions in proceedings against our interests may have a significant adverse effect on our business, financial condition, cash flows and results of operations. p.60p.61
Our Company and our Promoter, Narendra Chordia, were parties to a criminal matter titled 'State v. M/s Monomark Engineering Pvt. Ltd. and Narendra Chordia' before the Court of the Judicial Magistrate First Class at Margao, Goa. p.61
Any such proceedings or regulatory actions may result in monetary penalties, fines or other regulatory actions, require us to undertake remedial or corrective measures, and may require additional management attention and resources. p.61
The company's fleet management involves operational complexities such as tracking loan repayments and vehicle maintenance. p.63
Failure to manage the fleet effectively could lead to operational inefficiencies, increased costs, or project execution disruptions. p.63
Delays in servicing loan obligations may result in repossession of vehicles and adverse impacts on the company's credit profile. p.63
Maintaining a large fleet incurs recurring expenditures on fuel, repairs, and insurance, which could adversely affect profitability. p.63
The company incurred significant machine and equipment hire charges totaling ₹277.80 lakhs for the period ended June 30, 2026. p.65
The company remains dependent on third-party equipment despite owning a substantial fleet of industrial equipment and vehicles. p.65
Our operations require the deployment of a substantial fleet of vehicles and equipment across multiple project sites. p.65
Our reliance on third-party equipment exposes us to risks related to availability constraints, fluctuating hire charges, and dependence on third-party service providers. p.65
A breach of financial covenants in future financing agreements could trigger default, termination, or acceleration of credit facilities. p.68
Accelerated financing obligations may force the company to divert cash flow from operations, reducing availability for business needs. p.68
Litigation and regulatory matters
Litigation
Court cases, tax disputes and regulatory proceedings involving the company, promoters and directors.
A criminal registered case bearing no. 50521 of 2022 (State v. Riya Sharma) has been registered in the Court of 71-Addlitional Senior Civil Judge cum ACJM – 4. p.457
The Company holds a Certificate of incorporation dated September 29, 2005, issued by the Registrar of Companies, Jaipur, Rajasthan. p.460
The Company holds a fresh certificate of incorporation dated September 15, 2025, issued by the Registrar of Companies, Central Processing Centre. p.460
The Company has a GST registration number in Rajasthan (08AAECM5637L1Z2) and Gujarat (24AAECM5637L1Z8). p.461
The Company has professional tax registrations in Maharashtra, Gujarat, Odisha, and Madhya Pradesh. p.461
The Company holds a Udyam Registration Certificate for a medium enterprise classification. p.461
The Company holds a Sanstha Aadhaar Number issued by the Department of Statistics, Jaipur. p.461
The Company holds a Class A Electrical Contractor License issued by the Electrical Inspectorate Department, Rajasthan. p.461
The Company holds an Electrical Contractor License bearing License No. GLB-1223 issued by the Licencing Board, Panaji, Goa. p.461
The Company holds a Registration and License to work a factory under the Factories Act, 1948, for its manufacturing facility. p.462
The Company holds a Certificate for recognition of Company as a boiler repairer in Class I Category. p.462
The Company holds a Certificate of ISO 9001:2015 for its Quality Management System. p.462
The Company holds a Certificate of ISO 14001:2015 for its Environmental Management System. p.462
The Company holds a Certificate of ISO 45001:2018 for its Occupational Health and Safety Management System. p.462
The Company holds a Consent to establish dated February 22, 2026, for its factory under the Water (Prevention and Control of Pollution) Act, 1974. p.462
The Company holds a Consent to operate dated March 19, 2026, for its manufacturing facility under the Air (Prevention and Control of Pollution) Act, 1981. p.462
The Company holds a Labour Identification Number allotted under the Occupational Safety, Health and Working Conditions Code, 2020. p.462
The Company holds a Registration under the Employees' Provident Fund and Miscellaneous Provisions Act, 1952. p.462
The Company holds a Registration under the Employees State Insurance Act, 1948. p.462
The Company holds a Registration with the Ministry of Labour and Employment for its office. p.462
The Company holds a Trade License registration under the applicable provisions of the relevant state / municipal legislation. p.462
The Company holds a Registration with the respective state labour welfare boards under the applicable provisions of labour welfare legislations. p.462
The Company holds a Certificate of registration under the Inter-State Migrant Workmen (Regulation of Employment and Conditions of Service) Act, 1979. p.463
The Company holds a Contract License for maintenance of plant under the project at Metcoke Division, North Goa. p.463
The Company holds a Contract License for overhauling/refurbishment, testing services of mechanical & electrical equipment for project at PO- Lanjigarh, Dist- Kalahandi. p.463
The Company holds a Contract License to execute the work of pump and valve maintenance for project at PO- Lanjigarh, Dist- Kalahandi. p.463
The Company holds a Contract License for operation and maintenance of Copper Refinery and CCR Plant at Plot No.1, Sector 04N, S. No.295/Paiki 6/Paiki 2, 138/1, 140, North of APL Road, Near Adani Power Plant, APSEZ, Siracha and Navinal Village, Mundra, Kachchh, Gujarat. p.463
The Company holds a Contract License for fabrication and erection work for project at Parewar, Jaisalmer, Rajasthan. p.463
The Company holds a Contract License for mechanical and other misc work for project at Village Ras, Tehsil Jaitaran, Pali, Rajasthan. p.463
The Company holds a Contract License for maintenance for project at Plot No15, L-19, L-20, M-11, Landfill Site, Cuncolim Salcete South, Goa. p.463
The Company has no interest in the promotion or formation of its Company. p.467
The Company has no interest in the properties acquired or proposed to be acquired by its Company in the past three years. p.467
The Company has no interest in transactions for the acquisition of land, construction of building, or supply of machinery. p.467
The Company has no interest in the properties acquired by its Company within the three years preceding the date of filing this Red Herring Prospectus. p.467
The Company has no pending litigations involving its Group Company which may have a material impact on the Company. p.468
There are no common pursuits between the Company and its Group Company. p.468
None of the Group Company has any business interest in the Company. p.468
The Company has no material existing or anticipated transactions with its Group Company regarding the utilisation of issue proceeds. p.468
Regulatory disclosures
Approvals, licences, and any regulatory actions or compliance matters.
The Company received In-Principle approvals from BSE and NSE for listing on August 6, 2026. p.469
The Company is not debarred from accessing or operating the capital markets under any SEBI order. p.469
The Company and its Promoters are not declared as Wilful Defaulters or Fraudulent Borrowers. p.469
There are no outstanding convertible securities or rights to receive Equity Shares as of the filing date. p.469
The Company has had no material inspections by SEBI or other regulatory bodies requiring disclosure. p.469
The Company is in compliance with the Companies (Significant Beneficial Owners) Rules, 2018. p.470
The Company confirms it is eligible for the issue under Regulation 6(1) of the SEBI ICDR Regulations. p.470
The Company has entered into tripartite agreements with NSDL and CDSL for dematerialization of Equity Shares. p.471
The Equity Shares have not been registered under the U.S. Securities Act or any other applicable law of the United States. p.474
Equity Shares are being offered and sold outside of the United States in offshore transactions as defined in Regulation S. p.474
Equity Shares have not been registered, listed, or otherwise qualified in any other jurisdiction outside India. p.474
Until the expiry of 40 days after the commencement of this Issue, an offer or sale of Equity Shares within the United States may violate U.S. registration requirements. p.474
Bidders were advised to ensure that any Bid from them would not have exceeded the investment limits or the maximum number of Equity Shares that could be held by them under applicable law. p.474
Each Bidder agreed in the Allotment Advice that such Bidder will not sell or transfer any Equity Shares or any economic interest therein, including any off-shore derivative instruments, other than pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the U.S. Securities Act. p.474
The Company has received written consent dated March 09, 2026 from M/s Keyur Shah & Associates, Chartered Accountants to include their name as required under the Companies Act, 2013, in the Red Herring Prospectus. p.478
The issuer has not made any previous public or rights issues during the last five years, making it an Unlisted Issuer under SEBI (ICDR) Regulations. p.479
The issuer has not made any public or rights issues during the last three years, nor has it listed on any stock exchange in India or overseas. p.479
The issuer has not made any capital issues or public issues by its listed group companies or subsidiaries in the last five years. p.479
The issuer holds a SEBI certificate of registration as Merchant Banker Category 1 with registration number INM000012467 issued to Holani Consultants Private Limited on January 31, 2018. p.481
Our Company has registered on the SCORES in terms of SEBI circular no. CIR/OIAE/1/2013 dated April 17, 2013. p.484
Our Company has received and resolved 2 complaints during the three years preceding the date of this Red Herring Prospectus. p.484
Our Company has not sought any exemption under Regulation 300 of the SEBI ICDR Regulations. p.484
Our Company has appointed Ms. Stuti Taneja as our Company Secretary and Compliance Officer. p.484
Our Company has constituted a Stakeholders Relationship Committee responsible for redressal of security holders' grievances. p.484
The Registrar must submit cancelled/withdrawn/deleted application details to SCSBs within 60 minutes of Bid closure. p.489
Applications are unblocked by SCSBs on a daily basis and confirmed to BRLM and RTA per SEBI circular SEBI/HO/CFD/DIL2/CIR/P/2021/2480/1/M. p.489
Bids not uploaded on the electronic system or with full Bid Amount blocked will be rejected. p.489
Bidders are advised to submit Bids one day prior to the Bid/Issue Closing Date due to limited upload time. p.489
BSE and NSE clarified that Bids and revisions shall not be accepted on Saturdays and public holidays. p.489
BSE and NSE issued letters no. List/SMD/SM/2006 and no. NSE/IPO/25101-6 dated July 3 and July 6, 2006, respectively. p.489
Our Company reserves the right to revise the Price Band during the Bid/Issue Period, subject to SEBI ICDR Regulations. p.489
Price Band revisions may extend the Bid/Issue Period by at least three additional Working Days. p.489
Our Company shall ensure that the number of Bidders allotted for Equity Shares will not be less than 1,000. p.490
The issuer reserves the right to reject all or any multiple Bids in any or all categories. p.494
Anchor Investors are not permitted to use the ASBA process. p.494
Bids by FPIs with certain structures and the same PAN may be collated and identified as a single Bid. p.494
The issuer reserves the right not to proceed with the Issue for any reason after the Bid/Issue Opening Date but before Allotment. p.494
The issuer shall file a fresh Draft Red Herring Prospectus with SEBI and Stock Exchanges if the Issue is withdrawn and a fresh offering is planned. p.494
The issuer shall obtain final listing and trading approvals of the Stock Exchanges after Allotment. p.494
The issuer shall obtain final RoC approval of the Prospectus after it is filed with the RoC. p.494
The issuer shall refund/unblock the entire subscription amount received if Allotment is not made within the prescribed time period. p.494
The issuer is required to ensure ASBA accounts have sufficient credit balances to block full bid amounts. p.499
SMS alerts must be sent to investors regarding blocked or unblocked bid amounts as per SEBI circular no. SEBI/HO/CFD/DIL2/CIR/P/2022/51 dated April 20, 2022. p.499
Bid cum Application Forms for Resident Indians must be printed in white color. p.499
Bid cum Application Forms for Anchor Investors must be available at the offices of BRLM. p.499
Stock Exchanges must validate electronic bids with CDP records for DP ID, Client ID, and PAN on a real-time basis. p.499
The Sponsor Bank must initiate UPI Mandate Requests for blocking funds through NPCI before the Cut-Off Time of 5:00 pm on the Bid/Issue Closing Date. p.500
Pending UPI Mandate Requests at the Cut-Off Time shall lapse. p.500
Designated Intermediaries must retain physical bid cum application forms for Retail Individual Bidders for a period of six months. p.500
Designated Intermediaries must maintain electronic records relating to electronic bid cum application forms for a minimum period of three years. p.500
The issuer is not registered under the U.S. Securities Act and may not be issued or sold within the United States except pursuant to an exemption from registration requirements. p.500
Bid cum Application Forms for Eligible NRIs applying on a repatriation basis must be printed in blue color. p.502
Bids by Mutual Funds must include a certified copy of their SEBI registration certificate. p.502
Bids by HUFs must be made in the individual name of the Karta and specified in the Bid cum Application Form. p.503
Bids by FPIs must include a certified copy of the certificate of registration issued under the SEBI FPI Regulations. p.503
The issuer requires the PAN issued by the Income Tax Department of India for checking compliance for a single FPI. p.504
The issuer requires validation from Depositories for FPIs to ensure no breach of investment limits. p.504
An FPI may offer offshore derivative instruments only if they are issued by Category I FPIs, to eligible persons, after KYC compliance, or under SEBI-specified conditions. p.504
An FPI must ensure offshore derivative instrument transfers are made by or on behalf of the FPI subject to SEBI FPI Regulations. p.504
Bids with the same PAN but different beneficiary account numbers, Client IDs, or DP IDs are not regarded as multiple Bids. p.504
Who runs and controls the company
Management & board
Directors and senior management: who they are, their background and pay.
The company has total outstanding borrowings aggregating to ₹13,708.68 Lakhs as of September 30, 2026. p.450
Cash credit facilities with HDFC Bank Limited and Bank of Baroda are secured by fixed deposits. p.450
The company has obtained necessary consents from HDFC Bank Limited and Bank of Baroda for the Issue. p.450
Total secured fund-based borrowings amount to ₹7,431.40 Lakhs as of September 30, 2026. p.450
Total non-fund-based borrowings amount to ₹1,027.11 Lakhs as of September 30, 2026. p.450
The company has bank guarantee facilities totaling ₹2,000.00 Lakhs as of September 30, 2026. p.450
The company has a total non-fund-based borrowing of ₹5,185.00 lakhs with a total outstanding amount of ₹3,922.81 lakhs as of September 30, 2026. p.451
The company has a total vehicle and equipment loan of ₹3,715.81 lakhs with a total outstanding amount of ₹2,354.47 lakhs as of September 30, 2026. p.451
The company has a total bank borrowing of ₹19,142.04 lakhs with a total outstanding amount of ₹13,708.68 lakhs as of September 30, 2026. p.451
The company has a total channel finance facility of ₹5,200.00 lakhs with a total sanctioned amount of ₹5,200.00 lakhs as of September 30, 2026. p.451
The company has a total receivables financing arrangement with State Bank of India of ₹5,200.00 lakhs with a total sanctioned amount of ₹5,200.00 lakhs as of September 30, 2026. p.451
The company has a total total related-party revenue of ₹0.00 lakhs as of September 30, 2026. p.451
The company is subject to penalties for delayed or non-submission of documents for renewal of credit facilities. p.453
Penalties apply for delayed or non-submission of stock statements and property/stock/plant & machinery insurance. p.453
Penalties are levied for delayed or default in payment of interest and/or principal. p.453
Penalties apply for delayed or non-compliance of sanction terms pertaining to security creation. p.453
Penalties apply for delayed or non-compliance in documentation and any terms of the sanction for the credit facility. p.453
Penalties apply for delayed or non-compliance of sanction terms pertaining to stock audit, book debt statement, and stock statement. p.453
Penalties apply for maintaining a current account with other banks while a facility is granted under sole banking. p.453
Penalties apply for delayed or non-submission of UHFCE before the 7th of the next month after every quarter. p.453
Monomark Engineering (India) Limited IPO: common questions
Short answers drawn from the filings above.
How big is the Monomark Engineering (India) Limited IPO?
Monomark Engineering (India) Limited's IPO comprises a fresh issue of 2,70,00,000 shares, according to its Red Herring Prospectus. The price band is not stated in that document.
What are Monomark Engineering (India) Limited's revenue and profit?
Monomark Engineering (India) Limited reported revenue from operations of ₹562 Cr in FY26, +18.3% versus FY25. Net profit was ₹26 Cr (FY25: ₹18 Cr). Revenue grew at a compound rate of 20.1% a year from FY24 to FY26. Figures are read from the RHP, as printed there.
How much do promoters own in Monomark Engineering (India) Limited?
Promoters hold 91.4% of Monomark Engineering (India) Limited before the IPO.
How will Monomark Engineering (India) Limited use the IPO money?
The fresh-issue proceeds are earmarked for: Funding the incremental working capital requirements of our Company (₹120 Cr); General Corporate Purposes (amount not fixed yet).
What does Monomark Engineering (India) Limited do?
It's not just that MONOMARK is growing; it's that 31% of their profit came from one-off items, meaning the core business barely covers its own costs.
Who manages the Monomark Engineering (India) Limited IPO?
Book running lead managers: Holani Consultants Private Limited. Registrar to the offer: Bigshare Services Private Limited. Shares are proposed to list on BSE and NSE.
Where can I read the original Monomark Engineering (India) Limited IPO documents?
All 1 filing for Monomark Engineering (India) Limited (RHP) are listed on this page with links to the original PDFs on SEBI's website. Every page reference cites the exact page of the source document.
Source documents
Every page reference on this site links to the original SEBI PDF.
Document
Filed
Pages
On this page
Source
RHPRed Herring Prospectus
Monomark Engineering (India) Limited - RHP · 23 Nov 2026