Goel Construction Company Limited (CIN U45201RJ1997PLC013937) has filed a Prospectus with SEBI for an IPO comprising a fresh issue of 30,84,400 shares and an offer for sale of 7.24 lakh shares, priced at ₹250.00 to ₹263.00 per share. In FY25 it reported revenue of ₹590 Cr (+52.8% on FY24) and a net profit of ₹38 Cr. Promoters hold 97.3% before the IPO. Our fact-check of its claims found no medium or high concerns across 38 claims checked.
Read from public SEBI filings; last updated . Not investment advice.
Key signals
Read from the filing. Signals summarise it; they are not a recommendation or investment advice.
None serious38 claims checked: 0 high, 0 medium concern.
How we rate these
Valuation: P/E at the top of the band: up to 25x good, up to 40x watch, above that concern.
Growth: Sales growth per year: 20% or more good, 8% or more watch, below that concern.
Profitability: Net profit margin: 10% or more good, 4% or more watch, below that concern. The trend note compares operating margin with the year before (1.5 points either way).
Debt: Borrowings / net worth: up to 0.5x good, up to 1.5x watch, above that concern.
Profit into cash: Cash from operations as a share of net profit: 80% or more good, 40% or more watch, below that (or negative) concern.
One-off income: Other and one-off income as a share of pre-tax profit: up to 10% good, up to 30% watch, above that concern. Any one-off item management itself describes moves "good" to "watch".
Where the money goes: Offer for sale as a share of the whole issue: under 40% good, under 75% watch, above that concern. In an offer for sale the money goes to the selling shareholders, not the company.
Red flags: Fact-check results: any high-concern finding is concern, any medium is watch, otherwise good.
Rules are rules of thumb, not a verdict: a fast-growing business can reasonably carry a higher P/E, and some sectors run on debt.
The IPO
What Goel Construction Company Limited is offering, at what price, and who owns it today. Read from the Prospectus; anything the company hasn't fixed yet shows as pending.
Designated Intermediary where the Bid was submitted.
Book Running Lead Manager
Srujan Alpha Capital Advisors LLP
Registered Address: 112A, 1
st floor, Arun Bazar
S.V. Road, beside Bank of India Malad (West), Mumbai
0.64
4.0
0.00
Correspondence Address: 824 & 825, Corporate Avenue Sonawala Rd, opposite Atlanta Centre, Sonawala Industry Estate Goregaon, Mumbai
0.63
4.0
0.00
Telephone: +91 022
7.1
46
0.00
Discounted cash flow
What Goel Construction Company Limited's cash flow would be worth today. Change the rate, time period or growth to see how sensitive the answer is.
% / yr
years
% / yr
Worth today (10 years of cash)
₹605 Cr
Per share
₹345.11
Top of the price band
₹263.00
DCF value is 31.2% above it.
Projected cash flow (₹ Cr) Worth today at 11% a yearAlong the bottom: years from now
Starts from FY25 cash from operations of ₹38 Cr, grown 20% a year (based on revenue growth FY23–FY25, capped at 20%) and discounted at 11% a year, with no value counted beyond year 10. Per share uses the shares outstanding after the IPO at the top of the band. A simple illustration from the filing's numbers, not a forecast or investment advice; small changes to the rate or growth move the answer a lot.
The short version
Start here. The story in a few minutes, with every fact tied to the page it came from.
Forget the hype: there is zero verifiable record confirming that Mr. Satish Goel was re-appointed as Whole-Time Director for another three years starting in April 2024. This silence surrounding a key directorial appointment raises serious questions about the governance and transparency surrounding the recent IPO of Goel Construction Company Limited.
Company History and Corporate Restructuring
We need to look closely at the corporate history, as the entity underwent significant legal changes. The company was first incorporated as Goel Construction Company Private Limited on June 24, 1997, under the Companies Act, 1956, with the Registrar of Companies, Jaipur.
Read more · 4 points, 4 supporting facts
We need to look closely at the corporate history, as the entity underwent significant legal changes. The company was first incorporated as Goel Construction Company Private Limited on June 24, 1997, under the Companies Act, 1956, with the Registrar of Companies, Jaipur.
Originally incorporated as Goel Construction Company Private Limited on June 24, 1997.p.181
A major shift occurred in 2024 when the company changed its legal status and name. On November 26, 2024, the status was changed to a Public Limited Company, and the name was officially updated to Goel Construction Company Limited.
Status changed to Public Limited Company and name changed to Goel Construction Company Limited on November 26, 2024.p.181
The registered office location was also changed for administrative convenience. It moved from the previous address in Jaipur to 8, Vashisth Marg, Gom Defence, Vaishali Nagar, Jaipur, on July 30, 2025.
Registered office location changed to 8, Vashisth Marg, Gom Defence, Vaishali Nagar, Jaipur, on July 30, 2025.p.181
Furthermore, the Memorandum of Association saw amendments to reflect the name change on November 26, 2024, indicating ongoing structural adjustments to the company's legal framework.
Name Clause of the Memorandum of Association was amended on November 26, 2024.p.182
Dilution Details in Offer for Sale
The selling shareholders have consented to the Offer for Sale, which is proposed to constitute 26.35% of the post-offer paid-up Equity Share capital. This means the sale will directly impact a significant portion of the company's ownership structure.
Read more · 4 points, 4 supporting facts
The selling shareholders have consented to the Offer for Sale, which is proposed to constitute 26.35% of the post-offer paid-up Equity Share capital. This means the sale will directly impact a significant portion of the company's ownership structure.
The Offer shall constitute 26.35% of the post offer paid up Equity Share capital.p.24
The net proceeds from this fresh issue are earmarked for specific operational and financial purposes. These include funding capital expenditure for new assets and equipment.
The proposed utilization of net proceeds includes capital expenditure towards the purchase of additional equipments and fleets.p.24p.25
A portion of the funds is allocated for debt management, specifically the repayment or prepayment of existing outstanding borrowings availed by the Company.
The proposed utilization of net proceeds includes repayment or prepayment of certain outstanding borrowings availed by the Company.p.24p.25
General corporate purposes are capped, meaning funds allocated beyond a certain threshold will be strictly limited. This general purpose utilization shall not exceed 15% of the Gross Proceeds or Rs. 10 crores, whichever is less.
General corporate purposes shall not exceed 15% of the Gross Proceeds or Rs. 10 crores whichever is less.p.24p.25
Red Flags: Litigation and Liabilities
We start with serious legal exposure. The prospectus explicitly mentions material civil litigation proceedings involving the company's promoters. This signals immediate and ongoing legal jeopardy for the entity.
Read more · 4 points, 6 supporting facts
We start with serious legal exposure. The prospectus explicitly mentions material civil litigation proceedings involving the company's promoters. This signals immediate and ongoing legal jeopardy for the entity.
Material civil litigation proceedings involving the promoters exist.p.27
Beyond promoter disputes, the investigation uncovered further legal risks. There are also criminal proceedings against the promoter by SEBI or any stock exchange, adding another layer of regulatory scrutiny.
Criminal proceedings against the promoter by SEBI or any stock exchange are noted.p.27
The company is also saddled with contingent financial liabilities. This includes unresolved GST matters where the company has appealed, and other pending demands from the Department, indicating ongoing regulatory friction.
Contingent liabilities related to GST matters where the company preferred an appeal are noted.p.27
Contingent liabilities related to GST matters where the company submitted a reply and is awaiting a reply from the Department are noted.p.27
Furthermore, we found evidence of financial demands, specifically contingent liabilities related to TDS demands as per the Traces Portal, alongside potential disputes concerning wages and overtime.
Contingent liabilities related to TDS demands as per the Traces Portal are noted.p.27
There is a contingent liability related to wages and overtime disputes.p.27
Directors and Familial Ties
The Board structure includes six members: one Chairman and Managing Director, two Executive Directors, and three Non-Executive Independent Directors. The document details the qualifications and directorships of these key personnel, including the appointment terms for the Executive Directors.
Read more · 4 points, 6 supporting facts
The Board structure includes six members: one Chairman and Managing Director, two Executive Directors, and three Non-Executive Independent Directors. The document details the qualifications and directorships of these key personnel, including the appointment terms for the Executive Directors.
The Board of Directors is composed of six members: one Chairman and Managing Director, two Executive Directors, and three Non-Executive Independent Directors.p.189p.184
The relationship section explicitly discloses familial ties between several Directors and Key Managerial Personnel, which is a significant point for scrutiny. Furthermore, the document outlines the terms of appointment and remuneration for the Executive Directors.
The relationship section discloses familial ties between several Directors and Key Managerial Personnel.p.187
Specific director profiles are noted, such as Mr. Mahesh Chandra Agrawal, an Independent Director with extensive experience in the dairy and food industries, detailed on page 187. Similarly, Ms. Sakshi Agarwal is listed as an Independent Director with a background in business and consultancy.
Mr. Mahesh Chandra Agrawal is an Independent Director with extensive experience in the dairy and food industries.p.187
Ms. Sakshi Agarwal is an Independent Director with a background in business and consultancy.p.187
A key finding relates to director remuneration and sitting fees. The document confirms that Independent Directors and Non-Executive Directors are entitled to a sitting fee of ₹15,000 per meeting for attending various meetings, and no performance-linked bonus or profit-sharing plan is in place for the Directors.
Independent Directors and Non-Executive Directors are entitled to receive a sitting fee of ₹15,000 per meeting for attending various Committee and Board meetings.p.189
The Company does not have any performance linked bonus or profit-sharing plan for its Directors.p.189
Bottom line
In summary, this investigation reveals a complex corporate landscape for Goel Construction Company Limited, marked by significant legal exposure, including civil and criminal proceedings against its promoters, alongside unresolved financial liabilities. The structure also shows that an Offer for Sale will directly impact ownership, with proceeds earmarked for operational needs and debt repayment. Furthermore, the board composition raises scrutiny due to disclosed familial ties and the lack of performance-linked bonuses for key directors.
Red flags & fact-checks
We looked up selected claims from the filing (promoters, court cases, subsidiaries) on the open web. Here is what we found.
ClearPromoter background
Goel Construction Company Limited
100% confidence
What the filing says
Mr. Satish Goel was re-appointed as Whole-Time Director for a further period of 3 years starting April 01, 2024.
No current web search results were found to corroborate, contradict, update, or provide any information regarding the claim that Mr. Satish Goel was re-appointed as Whole-Time Director for a further period of 3 years starting April 01, 2024.
ClearPromoter background
Goel Construction Company Limited
100% confidence
What the filing says
Mr. Arun Kumar Goel was re-appointed as Whole-Time Director for a further period of 5 years starting April 01, 2024.
No current web search results were found to corroborate, contradict, update, or provide any information regarding the claim that Mr. Arun Kumar Goel was re-appointed as Whole-Time Director for a further period of 5 years starting April 01, 2024.
ClearPromoter background
Goel Construction Company Limited
100% confidence
What the filing says
Mr. Purushottam Dass Goel was re-appointed as Whole-Time Director for a further period of 3 years starting April 01, 2024.
No current web search results were found to corroborate, contradict, update, or provide any information regarding the claim that Mr. Purushottam Dass Goel was re-appointed as Whole-Time Director for a further period of 3 years starting April 01, 2024.
ClearPromoter background
Goel Construction Company Limited
100% confidence
What the filing says
Mr. Vijay Kumar Goel was appointed to the Board of Directors on July 01, 2023 and later re-appointed as Whole-Time Director.
No current web search results were found to corroborate, contradict, update, or provide any information regarding the claim about Mr. Vijay Kumar Goel's appointment and re-appointment as a Director for Goel Construction Company Limited.
ClearPromoter background
Goel Construction Company Limited
100% confidence
What the filing says
Mrs. Soni Goel was employed as Procurement Manager and received a salary of ₹20.00 lakhs during FY 2024-25, but no remuneration was paid to her as a Director during that financial year.
No current web search results were found to corroborate, contradict, update, or provide any information regarding the claim about Mrs. Soni Goel's salary or director remuneration.
ClearSubsidiary
Goel Construction Company Limited
100% confidence
What the filing says
The Company executed multiple industrial and infrastructure projects between 2010 and 2018.
No current web search results were found to corroborate, contradict, update, or provide any information regarding the claim that the company executed multiple industrial and infrastructure projects between 2010 and 2018.
Inside the filing
Section-by-section summaries of the Prospectus. Turn on Detailed view at the top to expand everything.
What the company does and how it got here
Summary of the prospectus
The company's own short pitch: business, strengths, strategy and headline numbers.
This section provides a general summary of disclosures and the terms of the offer included in the Prospectus, emphasizing that it is not exhaustive and should be read in conjunction with detailed information elsewhere in the document. The company is a construction contractor focused on industrial plants and infrastructure projects, emphasizing quality, timely execution, and adherence to specifications. They have successfully executed 19 projects with an aggregate contract value of ₹1,13,499.37 Lakhs over the last four years, and currently have 14 ongoing projects with an order book of ₹59,660.28 lakhs as of June 30, 2025. The industry context highlights the construction sector's vital role in the Indian economy and its linkages with numerous ancillary industries.
Key points (8)
The company specializes in the construction of Cement Plant, Power Plant, and Dairy Plant, among other industrial plants. p.23
The company's focus is on delivering construction services by ensuring quality, timely execution, and adherence to project specifications. p.23
The company has successfully executed and delivered 19 projects with an aggregate Contract Value of ₹1,13,499.37 Lakhs in the last four years. p.23
As of June 30, 2025, the company had 14 ongoing projects across eight states in India with an Order Book of ₹59,660.28 lakhs. p.23
The construction sector is a vital pillar of the Indian economy, ranking as the second-largest economic activity after agriculture. p.23
The construction ecosystem contributes approximately 14.3% to the total GVA at constant prices when combined with real estate services and ownership of dwellings. p.23
The Fresh Issue involves 30,84,400 Equity Shares aggregating to ₹ 8,104.61 Lakhs. p.23
The Offer for Sale involves 7,23,600 Equity Shares aggregating to ₹ 1,903.07 Lakhs. p.23
Business & industry
What the company actually does, its customers, competition and the industry it sells into.
This section primarily discusses industry overview, macroeconomic scenarios, and historical economic data, rather than specific details about the issuer's operations. It details various projections for the global and Indian economies, including GDP growth forecasts, inflation trends, and the impact of trade tariffs. It also provides sector-specific performance data for the Indian economy, such as growth in industrial, services, and agriculture sectors, as well as trends in Investment and Consumption.
The provided text details various economic indicators related to India, including quarterly and yearly growth trends, inflation scenarios, and the broader economic outlook. It covers fluctuations in quarterly growth rates, changes in inflation across different goods, and the impact of monetary policy decisions by the RBI. Furthermore, it discusses the growth drivers such as the expanding middle class and the government's focus on infrastructure development, alongside projections for India's economic growth and global standing.
The section discusses India's economic growth, particularly the shift towards the service sector, and the impact of urbanization on infrastructure demand. It details the growth in urban population and the resulting need for improved infrastructure, including housing, water, and transport. Furthermore, the text covers trends in Foreign Direct Investment (FDI) into India, noting facilitation measures that have streamlined investment processes. The construction sector is highlighted as a vital part of the economy, supporting various industries and having a significant impact on Gross Value Added (GVA).
The construction sector faces downside risks such as constrained credit flow and the impact of rupee depreciation on input costs, although the long-term outlook remains positive due to government initiatives like the National Infrastructure Pipeline and PM Gati Shakti. The sector shows strong growth, with the total economic output projected to rise significantly by FY 2030. Key segments like 'Dwellings, Other Buildings & Structures' are expected to remain dominant, while non-residential and infrastructure components are set for significant expansion. Growth is further propelled by government programs and private sector participation in commercial real estate and industrial development.
The text provides an overview of various sectors in India, including cement production, the power sector, and the dairy industry. Cement production has shown consistent growth in India, with various states contributing significantly to the output. The power sector is characterized by a mix of energy sources, with thermal power being the largest component. The dairy sector has seen substantial growth, positioning India as the world's largest milk-producing nation. The text also details the structure of the dairy industry, including cooperative and Milk Producer Companies, and the market scenario for milk production.
The text discusses capital expenditure trends across several key Indian sectors, including the cement, power, and dairy industries, highlighting expansion phases driven by infrastructure demands and government initiatives. It details significant investment in the cement industry for new plants, a surge in capex in the power sector for renewable and thermal capacity, and investment in the dairy sector to enhance processing and cold chain infrastructure. Furthermore, the text covers the infrastructure construction segment, detailing the role of transport and logistics, and the need for robust infrastructure to support India's economic growth goals.
The provided text discusses trends and challenges within the Indian education and healthcare sectors, alongside an overview of the competitive landscape in the construction industry. It details significant capital expenditure trends in both sectors, noting investment amounts and project announcements. Furthermore, it outlines various impediments to construction project execution, such as procedural formalities, financing hurdles, and regulatory complexities. The competitive construction market is characterized by fragmentation, intense price competition, and the influence of external factors like economic cycles and technological advancements.
The company operates as a construction contractor specializing in the execution of industrial plant and infrastructure projects. Its primary focus is on delivering construction services with a strong emphasis on quality, timely execution, and adherence to project specifications. The company has experience in various sectors, including the construction of cement plants, power plants, and dairy plants. They manage the complete project lifecycle, ensuring quality and adherence to client specifications through their understanding of industrial construction requirements and commitment to safety.
The company offers civil construction services across several industrial sectors, including Cement Plants, Power Plants, and Dairy Plants, covering everything from greenfield to brownfield projects. These services encompass various specialized civil and structural works such as clinkerization units, Balance of Plant (BOP) components, and dairy facilities, ensuring compliance with relevant standards. The company has a strong track record, having completed numerous projects and maintaining long-standing relationships with customers. The company demonstrates strong financial performance, with revenue growing at a CAGR of 47.62% over the last three fiscal years.
The company's financial performance metrics show various margins and returns, with details provided for comparison across different periods. The company emphasizes that its financial stability allows it to undertake larger and more complex projects. A critical aspect of their operations involves the effective management of equipment and fleet, which is essential for maintaining construction timelines and quality standards. The company invests in acquiring new equipment and fleet to ensure continuous availability and operational efficiency. Furthermore, the company aims to diversify its project mix beyond cement plants into sectors like power plants, dairy plants, and steel plants. Geographically, the company is expanding its presence across 12 Indian states and plans to enter new markets. The company operates as a construction contractor primarily focused on industrial plants and infrastructure projects.
The company utilizes various raw materials for its projects, procuring principal materials like cement, steel, and aluminum on a spot basis from approved vendors, while other materials are sourced locally. The company engages with a diverse customer base across the cement, power, and dairy industries, with top customers accounting for a significant portion of the revenue. The business operates under various regulatory frameworks concerning construction workers, contracts, and employment laws. The company also maintains insurance coverage for operational hazards and has received several awards recognizing its performance in the construction industry.
This section primarily details various Indian laws and regulations applicable to the company's operations, covering labor laws, tax legislation, environmental regulations, intellectual property laws, and foreign exchange rules. It outlines specific acts concerning bonus payments, standing orders, gratuity, sexual harassment at the workplace, and various laws related to the handling of goods, services, and environmental impact. Furthermore, it lists numerous other labor laws, tax acts, and regulations that may apply to the company's business activities.
Key points (133, showing 60)
India is expected to grow by 6.2% in CY 2025 and 6.3% in CY 2026, even amidst geopolitical uncertainties. p.125
The industrial sector experienced a moderation in FY 2025, with growth recorded at 5.90% year-on-year against 10.82% in FY 2024. p.126
The services sector retained its position as the largest contributor to GVA, rising to 54.93% in FY 2025. p.126
The agriculture sector's contribution to GVA declined marginally from 14.66% in FY 2024 to 14.41% in FY 2025. p.126
The manufacturing index showed moderation in FY 2025, growing by 4.08% against 5.54% in FY 2024. p.127
Gross fixed capital formation (GFCF) registered 7.06% year-on-year growth in FY 2025 against 8.78% in FY 2024. p.127
GFCF exhibited a fluctuating trend in quarterly growth over the previous year. p.128
The growth rate for GFCF moderated to 6.05% in the March quarter of FY 2024 against the previous two quarters. p.128
The growth rate for GFCF improved in Q1 FY 2025 by growing at 6.65% against 6.05% in the previous quarter. p.128
The GFCF to GDP ratio measured 33.91% in Q4 FY 2025. p.128
Private Final Expenditure (PFCE) showed growth in FY 2025 as compared to FY 2024. p.128
The Government launched the Production Linked Incentive (PLI) scheme to improve domestic manufacturing capability in large scale electronic manufacturing and other sectors. p.131
The PLI scheme covers 14 sectors, ranging from medical devices to solar PV modules. p.131
The overall incentives earmarked for the PLI scheme are estimated to be INR 2 trillion. p.131
The share of the middle class is expected to cross 60% by 2047. p.132
India is projected to become the world's third-largest economy with a projected GDP of USD 5 trillion within the next three years. p.132
The share of middle class increased from nearly 14% in 2005 to nearly 30% in 2021. p.132
India's per capita net national income stood at INR 1,06,744 in FY 2024. p.132
India is currently the fifth-largest economy globally, following the US, China, Japan, and Germany. p.132
India’s per capita GDP is projected to grow at a compound annual growth rate of 9.4% from CY 2024-29. p.133
The service sector accounts for over 50% of India's GDP, marking a shift from agriculture to services. p.133
India's urban population is projected to soar to over 558 million by 2031 and exceed 600 million by 2036. p.133
The share of urban population in total population is forecasted to cross 40% by 2030. p.133
The working population growth in urban areas is driven by job proliferation in sectors like IT, finance, retail, and healthcare. p.134
The construction sector is the second-largest economic activity in the country after agriculture, contributing an estimated 9.1% to the national Gross Value Added (GVA) in FY 2025. p.135
The construction sector has the capacity to generate up to five times the income in other industries for every unit of investment. p.135
The construction sector is the seventh-largest recipient of FDI in the construction development segment. p.136
The construction market is projected to become the second largest globally by 2030, with its GVA anticipated to reach INR 20.7 trillion, growing at a CAGR of 5.8% between FY 2025 and FY 2030. p.137
The construction sector is supported by various government initiatives like the National Infrastructure Pipeline (NIP), PM Gati Shakti, and Smart Cities Mission. p.137
The construction sector is poised for strong growth due to increased government budget allocations and major infrastructure programs. p.137
The long-term outlook for the construction industry remains positive, underpinned by government-led initiatives such as the National Infrastructure Pipeline and the PM Gati Shakti program. p.138
The total output of the construction sector is projected to rise from ₹39,77,500.00 Crore in FY 2024 to ₹57,66,100.00 Crore by FY 2030, reflecting a compound annual growth rate (CAGR) of approximately 5.8%. p.138
The 'Dwellings, Other Buildings & Structures' segment is expected to grow from ₹39,40,700.00 Crore in FY 2024 to ₹56,94,100.00 Crore by FY 2030. p.138
Non-residential buildings are anticipated to nearly double, reaching ₹24,3,900.00 Crore by FY 2030. p.138
Infrastructure development in roads and bridges is set to rise to ₹4,27,200.00 Crore by FY 2030. p.138
Land and structural improvements are projected at ₹17,78,600.00 Crore by FY 2030. p.138
The growth of the industrial sector is fueled by government initiatives like 'Make in India' and the Production Linked Incentive Scheme (PLI). p.141
The demand for industrial construction is driven by rising domestic consumption, export potential, globalization, and technological advancements. p.141
The Indian cement industry has emerged as the world's second-largest cement producer as of 2025, contributing approximately 10% of the global annual cement output. p.142
Installed cement capacity in India rose from 532 million metric tonnes (MMT) to 690 MMT from FY 2020 to FY 2025, achieving a CAGR of 5.3%. p.142
Cement production in India increased from 327.7 million tonnes to 453 million tonnes during FY2019 to FY2025, showing a CAGR of 5.5%. p.143
States including Rajasthan, Andhra Pradesh, Telangana, Karnataka, Madhya Pradesh, Gujarat, Tamil Nadu, Maharashtra, Uttar Pradesh, Chhattisgarh, Odisha, Meghalaya, and West Bengal account for almost 87% of India's cement output. p.143
The compound annual growth rate (CAGR) for cement consumption in India was 6% from FY 2020 to FY 2025. p.143
Thermal power constitutes the largest share of India's installed power capacity, accounting for approximately 47% of the total. p.143
India's installed electricity generation capacity grew from 370 GW in FY 2019 to 475 GW in FY 2025, reflecting a CAGR of 5.1%. p.144
Renewable energy sources, including solar, wind, and biomass, represent about 35% of the installed capacity. p.144
Hydro power contributes about 11% to the installed capacity, and nuclear power constitutes only about 2%. p.144
India's dairy sector has resulted in India becoming the world's largest milk-producing nation, with an annual production of 254 million tonnes in FY 2025. p.146
India contributes 25% of the world's total milk production. p.146
The dairy sector contributes about 5.50% of India's total Gross Value Added (GVA) and 30.23% of the GVA from agriculture and allied sectors. p.146
Uttar Pradesh emerged as the leading contributor to India's milk production in FY 2024, accounting for 16% of the total production. p.147
Butter production in India showed consistent growth, with production reaching 7.2 million tonnes in 2025. p.147
Capital expenditure in the cement industry indicates a significant expansion phase with numerous projects announced across various regions in India. p.148
The cement industry's expansion is critical to meeting the escalating demands of infrastructure development, aligning with India's ambition to become a USD 5 trillion economy by 2025. p.148
India’s top cement manufacturers are poised to invest approximately Rs 1.25 trillion in capital expenditure over the next two fiscal years 2026 and FY 2027 to add around 130 million tonnes of production capacity. p.148
The Indian power sector is witnessing a surge in capital expenditure driven by growing energy demands and a commitment to sustainable energy solutions. p.149
The Government of India has outlined a comprehensive capacity augmentation plan for thermal power plants, requiring an additional minimum of 80 GW of coal-based thermal capacity by 2032. p.149
The Indian dairy sector is experiencing capital expenditure directed towards expanding processing capacities, modernizing dairy farms, and enhancing cold chain infrastructure. p.150
The infrastructure construction segment encompasses the development and maintenance of essential infrastructure like roads, highways, railways, airports, and ports. p.151
The Indian freight and logistics market is estimated to reach USD 317.26 billion in 2024. p.151
History & corporate structure
How the company came to be: key milestones, subsidiaries, acquisitions and restructurings.
The company, originally incorporated in 1997, underwent a significant change in its legal status and name in 2024. The company's registered office location has been updated, and the Memorandum of Association has seen several amendments regarding the name and authorized share capital over the last ten years. The company has a history of executing numerous large infrastructure projects, including in the construction of cement, dairy, and power plants, and has received several awards recognizing its safety and performance. The company currently does not have any significant financial partnerships, subsidiaries, or joint ventures.
Key points (16)
The Company was originally incorporated as Goel Construction Company Private Limited under the Companies Act, 1956 with the Registrar of Companies, Jaipur on June 24, 1997. p.181
The status of the Company was changed to a Public Limited Company and the name was changed to Goel Construction Company Limited on November 26, 2024. p.181
A fresh certificate of incorporation was issued by the Registrar of Companies, Jaipur on December 20, 2024. p.181
The registered office location was changed from 230, City Centre, S. C. Road, Jaipur, Rajasthan, India 302001 to 8, Vashisth Marg, Gom Defence, Vaishali Nagar, Jaipur, Rajasthan, India 302021 for administrative convenience on July 30, 2025. p.181
The Name Clause of the Memorandum of Association was amended on November 26, 2024, to reflect the change in the company's name. p.182
The Authorized Share Capital was increased from ₹ 2,00,0/- to ₹ 20,00,0/- divided into 2,0 Equity Shares of ₹ 10/- each on August 14, 2024. p.182
The Authorized Capital was increased from ₹ 40,0/- to ₹ 2,00,0/- divided into 20,0 Equity Shares of ₹ 10/- each on September 30, 2017. p.182
The Company executed multiple industrial and infrastructure projects between 2010 and 2018. p.182
The Company secured a contract for the construction of a Full Unit of Cement Plant worth ₹12390 Lakhs in 2020. p.182
The Company secured a contract for the construction of a Dairy Plant worth ₹12672 Lakhs in 2022. p.182
The Company executed a single project of ₹16573 Lakhs for the construction of a cement plant in 2023. p.182
The Company bagged an order worth ₹17200 Lakhs for the construction of a power plant in 2024. p.182
The Company has received several awards, including a Certificate of appreciation for excellent performance in HR/IR at APJL 2x800 MW USCTPP Godda-Jharkhand in 2020. p.182
The Company has not made any material acquisition or divestments of any business or undertaking and has not undertaken any merger, amalgamation or any revaluation of assets in the 10 years immediately preceding the date of this Prospectus. p.183
The Company does not have a holding company as of the date of this Prospectus. p.183
The Company has not entered into any Shareholders or other material agreement as on the date of this Prospectus. p.183
The IPO terms and where the money goes
Cover & definitions
Headline offer terms and the glossary the rest of the document relies on.
The definitions section outlines various terms used in the Prospectus. It specifies that the company is Goel Construction Company Limited, a public limited company incorporated in India under the Companies Act, 1956, with its registered office in Jaipur. Key personnel such as the Managing Director is Mr. Purushottam Dass Goel, and the Statutory and Peer Reviewed Auditor is M/s. Ravi Sharma & Co., Chartered Accountants. The company's Corporate Identification Number (CIN) is U45201RJ1997PLC013937.
Key points (5)
The company's full legal name is Goel Construction Company Limited. p.4
The Corporate Identification Number (CIN) of the company is U45201RJ1997PLC013937. p.4
The Registered Office address of the company is 8, Vashisth Marg, Gom Defence, Vaishali Nagar, Jaipur, Rajasthan, India 302021. p.4
The Managing Director of the company is Mr. Purushottam Dass Goel. p.5
The Statutory and Peer Reviewed Auditor is M/s. Ravi Sharma & Co., Chartered Accountants. p.5
The offer
How many shares are being sold, by whom, and on what terms.
This section details various aspects related to the public offering process, including where to submit forms, the nature of the prospectus, and the flow of funds. It specifies that the Draft Red Herring Prospectus was filed with the Stock Exchange and that refunds can be processed through various electronic transfer methods. The text also outlines different categories of investors eligible for participation, such as Eligible Employees, Eligible NRIs, and Qualified Foreign Investors, along with details on the size and nature of the issue.
The provided text outlines various definitions and terms related to financial and regulatory concepts, including bidding mechanisms, definitions for working days, various business-related terms, and financial ratios. It details terms like UPI, various financial metrics such as Debt-Equity Ratio and EBITDA Margin, and different types of investment funds and regulations.
This section outlines various conventions regarding the use of financial information, market data, and currency within the Prospectus, specifying references to the Republic of India and its various governments. It details how financial data is derived from Restated Financial Statements and notes the differences between Indian GAAP, U.S.GAAP, and IFRS, cautioning readers not to rely solely on these disclosures. Furthermore, it clarifies the units used for numerical figures, the currency references, and the source of industry and market data, which is derived from a report commissioned by the company.
Key points (44)
Designated RTA Locations details are available on the Stock Exchange. p.9
Branches of SCSBs that collect ASBA Forms are listed on a specific SEBI website. p.9
The Draft Red Herring Prospectus was filed with the Stock Exchange and lacked complete offer particulars. p.9
Refunds can be processed through NACH, NEFT, Direct Credit, or RTGS as applicable. p.9
Eligible Employees are defined as permanent employees who work in India or abroad, excluding certain promoters and directors. p.9
The maximum bid amount for the Employee Reservation Portion by an Eligible Employee does not exceed ₹ 5 lakhs (net of Employee Discount), with an initial allotment exceeding ₹ 2 lakhs. p.9
Eligible NRIs are defined based on their jurisdiction and having opened dematerialized accounts with SEBI registered qualified depository participants. p.9
The Employee Reservation Portion consists of 73,600 Equity Shares aggregating to ₹ 185.47 lakhs, not exceeding 0.51% of the Post-Offer Equity Share Capital. p.9
A discount of ₹ 10 per Equity Share was offered to Eligible Employees bidding in the Employee Reservation Portion. p.9
The Market Making Agreement was established between the Company, BRLM, and Choice Equity Broking Private Limited. p.10
The Net Offer involves 35,44,000 Equity Shares of face value ₹ 10/- each for cash at a price of ₹ 263/- per Equity Share, aggregating ₹ 9,320.72 Lakhs. p.10
The Floor Price is set at ₹ 250/- and below which no bids were accepted and the bid was less than the face value of the Equity Shares. p.11
The Fresh Issue involves 30,84,400 Equity Shares aggregating to ₹ 8,104.61 Lakhs. p.11
The Offer Price is ₹ 263/- per Equity Share, which is the final price within the Price Band. p.11
The Price Band is defined as a minimum price of ₹ 250/- and a maximum price (Cap Price) of ₹ 263/-. p.11
The Offer for Sale involves the sale by Selling Shareholders of 7,23,600 Equity Shares for cash at a price of ₹ 263/- per Equity Share. p.11
The Offer Price was decided in consultation with the BRLM in accordance with the Book Building Process. p.11
The Offer Agreement was entered into between the Company, Selling Shareholders, and the BRLM. p.11
The Offer includes a Fresh Issue of 30,84,400 Equity Shares, the Employee Reservation Portion, and the Offer for Sale of 7,23,600 Equity Shares by Selling Shareholders. p.11
The bidding mechanism used was the UPI mechanism to make an ASBA Bid in the Offer. p.14
The relevant legislation mentioned includes the U.S. Securities Act of 1933, as amended. p.14
A wilful defaulter is defined as an entity or person categorized as such by any bank or financial institution or consortium under Regulation 2(1)(lll) of the SEBI ICDR Regulations. p.14
Working Day is defined as all days excluding Saturdays, Sundays, and public holidays on which commercial banks in the city mentioned in the Prospectus are open for business. p.14
The Debt-Equity Ratio is calculated by dividing total debt by total equity, where total debt includes long-term and short-term borrowings, and total equity is the sum of equity share capital, reserves, and surplus. p.14
EBITDA is defined as Earnings before interest, taxes, depreciation, and amortization expense, which is arrived at by obtaining the profit before tax/(loss) for the year and adding back finance costs, depreciation, and amortization expense less other income. p.14
Net Profit Margin is calculated as restated profit/(loss) for the year divided by revenue from operations. p.14
Return on Net Worth is calculated by dividing the net profit after tax, as restated, attributable to the owners of the Company for the year by the average net worth. p.14
The Order Book to Revenue from Operation is calculated as the order book at the end of the period divided by revenue from operations. p.14
The CPI is defined as the Consumer Price Index. p.15
The UPI is defined as the Unified Payments Interface. p.15
The RBI is defined as the Reserve Bank of India. p.15
The GDP is defined as Gross Domestic Product. p.15
The SEBI is defined as the Securities and Exchange Board of India. p.18
The SEBI ICDR Regulations are mentioned as a relevant regulation. p.18
References to 'India' in the Prospectus pertain to the Republic of India and its territories and possessions. p.19
References to the 'U.S.', 'USA', or 'United States' refer to the United States of America. p.19
Unless otherwise specified, any time mentioned in the Prospectus is in Indian Standard Time (IST). p.19
Financial information is derived from Restated Financial Statements, including statements as of March 31, 2025, March 31, 2024, and March 31, 2023. p.19
Discrepancies in tables between total and sum are due to rounding off. p.19
All figures in decimals have been rounded off to the second decimal place, and percentage figures have been rounded off to two decimal places in certain sections. p.19
Industry and market data is derived from the 'Industry Report on Construction Industry in India' dated August 06, 2025, prepared by Dun & Bradstreet Information Services India Private Limited (D&B India). p.20
The D&B India is an independent agency with no relationship to the Company, its Promoters, Directors, KMPs, or SMPs. p.20
Exchange rates for USD to INR are provided for March 31, 2025 (85.58), March 31, 2024 (83.37), and March 31, 2023 (82.22). p.20
Use of proceeds
What the money raised will be spent on: growth, debt repayment or promoters cashing out.
The Selling Shareholders have consented to the Offer for Sale, which is proposed to constitute 26.35% of the post-offer paid-up Equity Share capital. The Offer details include the number of shares held by various Selling Shareholders and the corresponding number of shares offered for sale. The proposed utilization of the net proceeds from the Fresh Issue is detailed, allocating funds towards capital expenditure, debt repayment, and general corporate purposes. The table shows the estimated deployment of these funds across fiscal years.
Key points (4)
The Offer shall constitute 26.35% of the post offer paid up Equity Share capital of our Company. p.24
The proposed utilization of net proceeds includes capital expenditure towards the purchase of additional equipments and fleets. p.24p.25
The proposed utilization of net proceeds includes repayment or prepayment of certain outstanding borrowings availed by the Company. p.24p.25
The proposed utilization of net proceeds includes general corporate purposes, which shall not exceed 15% of the Gross Proceeds or Rs. 10 crores whichever is less. p.24p.25
Capital structure
Who owns what today, past share issues and what the shareholding looks like after the IPO.
This section details the various aspects of the company's capital structure, including the authorized, issued, and paid-up share capital, as well as the history of share allotments. The data shows the structure of the share capital as of the prospectus date, the details of the offer for sale, and a comprehensive history of share issuances through various private placements and other means. Furthermore, it outlines the history of changes to the authorized share capital over time.
The section details the shareholding pattern of the company as of the date of the Prospectus, including a list of various shareholders and the corresponding number of equity shares they hold. The data is presented in a structured format showing different categories of shareholders, such as Promoters and Promoter Group, Public, and Non Promoter-Non Public. The table also provides various metrics related to the shareholding, including percentages of total shares held and the number of voting rights.
The section details the shareholding pattern of public shareholders and non-promoter, non-public shareholders. The promoter and promoter group held a significant portion of the total equity shares. The public shareholding details are categorized across various investor types, including domestic and foreign entities. The non-promoter non-public shareholding includes holdings from a Custodian/DR Holder and an Employee Benefit Trust, along with holdings by Mr. Piyush Goel.
This section details various aspects of the company's shareholding structure, including lists of shareholders holding 1% or more of the paid-up share capital on different dates. It also provides information on the build-up of promoter shareholding since the company's incorporation, showing transactions such as cash subscriptions, further issues, and bonus issues. Furthermore, the data includes details on the transfer of shares by gift or other means, which impacts the percentage of the post-offer capital.
This section details various transactions and shareholding movements involving different promoters and directors over time, including cash transfers and bonus issues. It also outlines specific lock-in provisions for a portion of the promoter's holding, requiring certain shares to be held for specified periods. Furthermore, the document confirms that no financing arrangements were in place for the purchase of securities by others and that no equity shares held by the promoters are pledged.
This section details various compliance and offer-related disclosures, including the status of promoter shareholding and the structure of the offer. It clarifies that the company has no outstanding convertible instruments and sets forth reporting timelines for transactions by the promoter and promoter group. Furthermore, it specifies that the offer involves a fresh issue of equity shares, and outlines the intended utilization of the net proceeds, which includes capital expenditure for equipment and fleet, repayment of borrowings, and general corporate purposes. The document also discusses the process for funding these objects and the flexibility management has in deploying the funds.
This section details the proposed purchase of various equipment and fleets, including construction machinery and tower cranes, for the company. It outlines the cost breakdown for these items, noting that a portion of the net proceeds will be utilized for these acquisitions. Furthermore, the text discusses the repayment of outstanding borrowings and the utilization of net proceeds for general corporate purposes, subject to certain limits. It also covers the process for offer-related expenses and the monitoring of fresh issue proceeds.
The section discusses provisions regarding the variation of the company's objects, requiring shareholder approval through a special resolution and adherence to applicable laws. It also clarifies that no proceeds will be paid to promoters or related parties except for the proceeds received from an Offer for Sale. The section details the basis for determining the Offer Price, which involves consultation with BRLM based on market demand and various qualitative and quantitative factors. Quantitative factors include Basic and Diluted Earnings Per Share (EPS), Price to Earnings (P/E) ratios, Return on Net Worth (RoNW), Return on Capital Employed (RoCE), Debt-to-Equity Ratio, and Net Asset Value (NAV).
The provided section details various Key Performance Indicators (KPIs) and financial ratios for the company, including EBITDA Margin, Net Profit after Tax, Net Profit Margin, Return on Net Worth, Return on Capital Employed, Debt-Equity Ratio, and Net Worth across different periods. It also outlines procedures for calculating the Weighted Average Cost of Acquisition (WACA) for equity shares based on primary and secondary transactions. Furthermore, the text discusses various special tax benefits available to the company and its shareholders under Indian tax laws, including provisions related to corporate tax rates, dividend income, capital gains tax, and the simplified/new tax regime.
This section discusses the applicability of special tax benefits under various Indian laws, including GST, Customs, and Foreign Trade regulations. It clarifies that no special tax benefits are available to the Company or its shareholders under the mentioned acts. Furthermore, it notes that the ability to derive these benefits depends on the fulfillment of prescribed conditions by the Company or its shareholders, which may not be chosen based on business imperatives. The statement is intended for general investor information and is not a substitute for professional tax advice.
Key points (81, showing 60)
The authorized share capital was initially ₹15,0 divided into 1,50,000 Equity Shares of ₹10 each. p.77
The authorized share capital was increased to ₹40,0 consisting of 4,0 Equity Shares of ₹10 each on September 30, 2017. p.77
The authorized share capital was further increased to ₹2,00,0 consisting of 20,0 Equity Shares of ₹10 each on a date after August 14, 2024. p.77
The cumulative paid-up Equity Share capital on Incorporation was ₹30,000 for 3,000 Equity Shares. p.80
A total of 5,17,000 Equity Shares were issued through Cash Private Placement on March 27, 1998. p.80
A total of 10,33,200 Equity Shares were held after a Bonus Issue in the ratio of 5 bonus shares for every 1. p.81
The total number of fully paid-up equity shares held by Promoters and Promoter Group is 1,11,3,400. p.85
The total number of shares held by the Public category is 1,10,000. p.85
The total number of shares held across all categories (A+B+C) is 1,13,65,200. p.85
The shareholding as a percentage of total shares held (calculated as per SCRR, 1957) for Promoters and Promoter Group is 97.70%. p.85
The shareholding as a percentage of total shares held for the Public category is 0.97%. p.85
The total number of shares held in dematerialized form is 1,13,65,200. p.85
The Total Shareholding of Promoter and Promoter Group was 93.63% as of the date of the Prospectus. p.87
The Total Public Shareholding was calculated by summing various categories of public shareholders. p.90
The Non-Promoter Non-Public shareholding included 1,51,800 shares held by Mr. Piyush Goel. p.91
The Non-Promoter Non-Public shareholding included 1,51,800 shares held by an Employee Benefit Trust. p.91
As of the date of the filing of the Prospectus, there were 23 shareholders. p.92
The total percentage of equity share capital held by listed shareholders as of the date of the filing was 95.57%. p.92
The Promoters and Promoter Group held 97.30% of the pre-Offer issued, subscribed and paid-up Equity Share capital on a fully diluted basis. p.93
The build-up of Mr. Purushottam Dass Goel's shareholding showed a change from 10% to 10% in percentage terms between June 24, 1997 and March 27, 1998. p.94
A cash transfer from Mr. Lalit Kumar Siwatch resulted in a change in percentage from 0.01 to 0.01 between March 27, 1998 and March 29, 1999. p.94
A cash transfer from Mr. Subhash Beniwal resulted in a change in percentage from 0.05 to 0.04 between March 27, 1998 and February 22, 2018. p.94
A bonus issue in the ratio of 10 shares for every 1 share held resulted in a change in percentage from 1.14 to 0.89 between March 12, 2025 and December 25, 2023. p.94
A transfer by way of gift to M/s. NMG Private Trust resulted in a change in percentage from 0.56 to 0.44 between March 27, 2024 and April 19, 2024. p.95
A transfer by way of gift from Mr. Sunil Kumar Goel resulted in a change in percentage from 0.82 to 0.65 between April 19, 2024 and April 29, 2024. p.95
A cash transfer occurred on March 21, 2015, involving Mr. Manish Goel. p.97
A cash transfer occurred on March 21, 2015, involving Ms. Sarla Rani. p.97
A cash transfer occurred on June 27, 2016, involving Mr. Rajesh Didwania. p.97
A transaction on February 22, 2018, involved a Bonus Issue in the ratio of 5 shares for every 1 share held. p.97
A transaction on March 12, 2025, involved a Bonus Issue in the ratio of 10 shares for every 1 share held. p.97
A transaction on March 27, 1998, involved Mr. Amit Goel with a Cash Further Issue. p.97
A transaction on March 30, 2010, involved a Cash Transfer from Mr. Subhash Beniwal. p.97
A transaction on October 4, 2006, involved a Cash Transfer from Mr. Deelip Kacholia. p.97
A transaction on March 21, 2015, involved a Cash Transfer from Ms. Manju Goel. p.97
A transaction on March 21, 2015, involved a Cash Transfer from Mr. Ghanshyam Agrawal. p.97
A transaction on December 25, 2023, involved a Transfer by way of Gift from Mrs. Urmila Goel. p.97
A transaction on January 25, 2012, involved a Transfer by way of gift from Mr. Ratan Kumar Goel. p.98
A transaction on December 25, 2023, involved a Transfer by way of gift from Mr. Purushottam Dass Goel. p.98
A transaction on December 25, 2023, involved a Transfer by way of gift from Mr. Geeta Devi Goel. p.98
The total shareholding of the Promoter Group was 83.33% of the post-Offer paid-up capital. p.98
The Offer comprises a Fresh Offer of 30,84,400 Equity Shares and an Offer for Sale of 7,23,600 shares. p.103
Net Proceeds from the Fresh Issue are ₹ 7,452.75 Lakhs. p.103
₹ 651.86 Lakhs will be apportioned to the company from the Fresh Issue Proceeds. p.103
₹ 151.88 Lakhs will be apportioned from Selling Shareholders. p.103
Capital expenditure towards purchase of additional equipments and fleets is estimated at ₹ 4,174.38 Lakhs. p.104
Mr. Purushottam Dass Goel holds 35.84% of the pre-offer equity share capital. p.106
Mr. Arun Kumar Goel holds 12.99% of the pre-offer equity share capital. p.106
Mrs. Soni Goel holds 1.39% of the pre-offer equity share capital. p.106
The proposed plan of capital expenditure towards purchase of construction equipment and fleet was approved by the Board on March 24, 2025 and July 30, 2025. p.106
The total cost of the proposed equipment and fleet is ₹4,205.05 Lakhs. p.107
The proposed utilization from the proceeds towards the equipment and fleet is ₹4,174.38 Lakhs. p.107
The remaining amount of ₹30.67 Lakhs will be funded through General Corporate Purposes (GCP) or internal accruals of the Company. p.107
The balance of Net Offer Proceeds of ₹974.98 Lakhs is proposed to be utilized for general corporate purposes, subject to not exceeding 15% of Gross Proceeds or ₹10 crores whichever is less. p.110
Total estimated offer expenses are approximately ₹803.74 Lakh. p.110
The Offer Price is determined by the company and selling shareholders in consultation with the BRLM based on market demand for equity shares. p.113
The face value of the Equity Shares is ₹ 10 each, and the Offer Price is set at 25.00 times the face value at the lower end of the Price Band and 26.3 times the face value at the higher end. p.113
Basic and Diluted Earnings Per Share (EPS) figures for the financial years ended March 31, 2025, 2024, and 2023 are provided. p.113
Price Earnings (P/E) ratios are calculated based on Basic EPS for the year ended March 31, 2025, with values ranging from 7.41 to 7.80. p.113
Industry P/E Ratios for peer companies are provided, with a highest ratio of 33.03 and a lowest of 8.77. p.114
Return on Net Worth (RoNW) figures for the financial years ended March 31, 2025, 2024, and 2023 are disclosed. p.114
What could go wrong, per the company
Risk factors
The risks the company is legally required to disclose, in its own words.
The document outlines various contingent liabilities and related party transactions for the company. It details civil litigation proceedings involving the promoters and key management personnel, as well as various financial liabilities such as GST matters and TDS demands. Furthermore, the document provides extensive details on related party transactions, including remuneration, salaries, and various financial flows, categorized by different financial years.
The risk factors section highlights several uncertainties related to the execution of ongoing projects, including potential delays, modifications, or cancellations due to various reasons beyond the company's control. These implementation risks encompass issues such as client approvals, design revisions, scope changes, and potential disputes with sub-contractors or workers. Furthermore, there are risks concerning the timely delivery of raw materials, equipment, and skilled manpower, as well as potential issues with regulatory approvals and financial requirements that could render projects unprofitable. Additionally, the order book may not accurately reflect future results, as it represents secured but uncompleted contractual commitments.
The company's order book is concentrated in cement plants, power plants, and dairy projects, with potential risks arising from contract cancellations, scope changes, or client defaults which could impact realized earnings. There is a risk of not being able to secure future work orders due to competition and the difficulty in meeting pre-qualification criteria. Furthermore, significant revenue is derived from a limited number of clients, increasing revenue volatility. The company also faces risks related to the obsolescence or breakdown of owned equipment and fleet, which can increase costs, and potential liabilities arising from service defects or insurance coverage inadequacies. Finally, there are concerns regarding delays in regulatory filings and the untraceability of certain corporate records.
The company faces risks related to negative cash flows, which could negatively impact its business and financial condition. There are ongoing legal proceedings involving the company, its promoters, and directors, which pose a risk to its reputation and financial standing. Furthermore, the company relies on third-party sub-contractors, exposing it to performance issues, cost overruns, and potential liability claims. Operational risks include dependence on contract labor availability, reliance on raw material suppliers, and exposure to delays or price fluctuations in construction materials. Finally, the company has a history of delays in filing GST returns, which may lead to regulatory scrutiny and penalties.
The company faces various risks related to external environments, including economic, political, and social instability that could impact projects. Operational risks include hazards at construction sites, potential equipment failure, and accidents that could cause loss of life or property. There are concerns regarding the reliability of insurance coverage, the traceability of key personnel's educational qualifications, and potential non-compliance with statutory and regulatory requirements, including labor laws and environmental regulations. Furthermore, the company is exposed to risks from related party transactions, competition, seasonal variations in work progress, and difficulties in securing future funding.
The company faces several risks related to financial claims, operational dependencies, and market conditions. Risks include potential write-downs due to unestablished reserves, liability for substandard work from suppliers, and dependence on economic health in key sectors like Cement, Power, and Dairy. Furthermore, the company is vulnerable to economic downturns, credit tightening, and changes in industry needs or technology. There are also risks concerning interest rate fluctuations, the ability to manage growth and execution of strategies, and challenges in adapting to changing market requirements. Finally, there are concerns regarding intellectual property protection, promoter control, and the increased burden of compliance as a public listed company.
The prospectus outlines several risks related to shareholder rights, including potential dilution of ownership due to pre-emptive rights restrictions under Indian law. There are concerns about the enforceability of judgments obtained in foreign courts against the company and its officers, as India may not recognize such judgments. Furthermore, the business is exposed to political instability, changes in economic liberalization policies, and various macroeconomic factors affecting India. The company is also subject to various regulatory and economic uncertainties beyond its control.
This section provides a summary of the company's financial statements for the years ended March 31, 2025, 2024, and 2023, detailing changes in equity and liabilities. The data includes figures for share capital, reserves, borrowings, provisions, and various assets and current liabilities. The text also includes details regarding the company's incorporation history and the details of its Board of Directors.
This section details various compliance and advisory roles related to the issuance process, including the identification of key personnel such as the Chief Financial Officer and Company Secretary, and the listing of various service providers like Book Running Lead Managers, Legal Counsel, and Auditors. It also outlines procedures for investor grievances, the roles of different intermediaries like Syndicate Banks, Registered Brokers, and Depository Participants, and the regulatory filings involved in the offer process. Furthermore, it specifies the methodology for the book-building process and the allocation of securities to different investor categories.
This section details various aspects of the offer process, including allocation proportions, bidder participation rules, and the role of underwriters and market makers. It specifies minimum allocation percentages for different bidder categories and outlines restrictions on bid revisions for various investors. Furthermore, it covers the regulatory framework, such as compliance with SEBI ICDR Regulations, and the obligations of market makers regarding quoting, inventory management, and potential penalties.
Key points (139, showing 60)
There are material civil litigation proceedings involving the promoters. p.27
There are criminal proceedings against the promoter by SEBI or any stock exchange. p.27
There are material civil litigation involving the company's KMP and SMP. p.27
The civil litigation cases mentioned under 'Litigation Involving Our Company' and 'Litigation Involving Our Promoters' are the same cases. p.27
The company has contingent liabilities related to GST matters where the company preferred an appeal. p.27
The company has contingent liabilities related to GST matters where the company submitted a reply and is awaiting a reply from the Department. p.27
The company has contingent liabilities related to TDS demands as per the Traces Portal. p.27
There is a contingent liability related to wages and overtime disputes. p.27
The summary details related party transactions involving Key Management Personnel (KMP). p.28
The summary details related party transactions involving relatives of directors. p.28
Related party transactions represent a small percentage of the total income of the company. p.28
Ongoing projects are exposed to various implementation risks and uncertainties which may be delayed, modified, or cancelled for reasons beyond the company's control, potentially affecting the business, financial condition, and operating results. p.36
Execution of projects may be delayed due to issues such as delays in clients’ approval on variations, design & drawings, extensive revision by clients, increase in scope of work and location of work, or the outbreak of a pandemic like COVID-19. p.36
Implementation risks include significant additional costs resulting from project delays. p.36
Implementation risks include clients seeking liquidated damages for failure to meet project timelines. p.36
Implementation risks include the termination of contracts or rejection of project timelines by clients. p.36
Implementation risks include the risk of equipment and fleet failure or industrial accidents that could cause injury, loss of life, and severe damage to property and equipment. p.36
Implementation risks include the risk of disputes with sub-contractors leading to delays. p.36
Implementation risks include disputes with workers and force majeure events. p.36
Implementation risks include unanticipated costs due to amendments in plans and specifications. p.36
Project execution may be affected by delays in receiving work schedules and engineering inputs, approvals, and decisions from the client. p.36
Project execution may be affected by delays in the delivery of raw materials, components, or equipment. p.36
Project execution may be affected by changes to project plans and process requirements. p.36
Project execution may be affected by delays due to interface issues with other contractors employed by the customer. p.36
Project execution may be affected by delays in performance by sub-contractors. p.36
Project execution may be affected by delays in transportation of equipment, fleet, and construction material. p.36
Project execution may be affected by the unavailability of skilled and unskilled labor. p.36
Risks exist regarding regulatory approvals and financial requirements for project execution which may render projects unprofitable. p.36
The order book may not be representative of future results, and actual income may be significantly less than estimates reflected in the order book. p.36
The order book calculation varies across industries and companies, and the method used to calculate it may be subjective and vary from peers. p.36
The order book represents the aggregate value of contractual commitments secured but remains to be completed. p.36
Cancellations or unanticipated variations or scope or schedule adjustments may occur, meaning the order book does not necessarily indicate future earnings. p.37
Contracting parties may default and fail to make dues payment, meaning anticipated income may not be realized or realized on time. p.37
Project cancellations or scope adjustments could reduce the order book and the income and profits earned from contracts. p.37
The company may not be able to compete and secure work orders for projects bid for, which could adversely affect the business and results of operations. p.37
The company cannot assure that it will be able to meet technical and financial qualification criteria for awarded projects. p.37
The company may not be successful in winning all the projects it bids for, which could have an adverse effect on business, financial condition, cash flows, results of operations, and growth prospects. p.37
Significant revenue is derived from a limited number of clients, increasing the potential volatility of results and exposure to individual contract risks. p.38
The company may be required to accept onerous contractual terms in contracts awarded by top clients. p.38
Events such as adverse market conditions, restructuring, or changes in the regulatory regime could adversely affect clients and impact the business. p.38
Certain corporate records and regulatory filings pertaining to increases in authorized share capital are not traceable. p.38
There is no assurance that deficiencies in internal controls and compliance will not arise as operations expand, and the company cannot assure the ability to effectively implement and maintain adequate measures to rectify deficiencies. p.38
Operations are subject to hazards inherent in providing erection and civil work, such as risks of equipment and fleet failure, work accidents, fire or explosion, and environmental damage. p.39
Defects in services provided may give rise to claims, liabilities, costs, and expenses relating to damage to property, equipment, fleet, facilities, pollution, inefficient operating processes, loss of production, or suspension of operations within warranty periods. p.39
There is no assurance that insurance coverage maintained will be fully honored, in part or on time, or that sufficient insurance has been taken to cover all material losses. p.39
Any liability in excess of insurance limits could result in additional costs that reduce profits and adversely affect the business. p.39
The company has experienced negative cash flows in the past, and sustained negative cash flow could adversely impact its business, financial condition, and results of operations. p.42
The company, promoters, and directors are involved in certain legal proceedings pending at different levels of adjudication before various courts and tribunals. p.42
The company has been unable to trace income tax notices and orders related to certain assessment years for one of the Independent Directors. p.42
There are material civil litigation cases involving the company, including 76.86 lakhs in total amount. p.42
There are taxation cases involving directors other than promoters, including 0.88 lakhs in total amount. p.42
The company may be liable to penalties and have a material adverse effect on its reputation, business, and financial condition due to adverse decisions in legal proceedings. p.43
The company relies on third-party sub-contractors, and failure by them to comply with laws or provide services could affect contract completion and result in penalties or losses. p.43
Payments to MSME vendors were delayed beyond the prescribed period, which could strain relationships with suppliers and disrupt supply chains. p.44
Non-compliance with the MSMED Act carries legal and reputational risks, including regulatory scrutiny, penal interest obligations, and adverse public perception. p.44
The timely execution of projects depends on the adequate and timely supply of key construction materials. p.45
Disruption in transportation could have an adverse effect on the delivery of supplies due to strikes or disturbances. p.45
Increases in construction material prices or limited availability could adversely affect the company's ability to meet material requirements. p.45
The company may be exposed to liabilities arising from defects during construction, which could lead to claims, costs, and expenses. p.46
Delays in filing GST returns across different financial years and states may expose the company to penalties, regulatory scrutiny, and impact on operations. p.46
Litigation and regulatory matters
Litigation
Court cases, tax disputes and regulatory proceedings involving the company, promoters and directors.
The section confirms the absence of outstanding criminal proceedings, actions by regulatory or statutory authorities, or outstanding claims related to direct and indirect taxes involving the Company, its Directors, Promoters, or Group Company. It also states that no disciplinary actions including penalties by SEBI or Stock Exchanges have been imposed on the Promoters in the last five financial years. The text details several material civil litigations, including a civil suit filed by Kuber Alloys against Goel Construction Co. Pvt. Ltd. and others, and a petition filed by Kuber Alloys seeking to set aside a lower court's order. Furthermore, it lists pending litigation by the Company against Haryana State Roads and Bridges and Development Corporation Limited for recovery of dues related to a construction contract, and an appeal filed by Goel Construction Company Private Limited challenging an order related to payment of wages. The section also details various tax proceedings and outstanding dues to creditors.
This section primarily lists various Certificates of Registration for goods and services tax under different State and Central Goods and Services Tax Acts, all of which are currently valid till cancelled. Additionally, it details two Labour Law-related approvals, specifically contractor licenses for project sites in Madhya Pradesh and a license for a project site in Khawaspura, which are valid until 2025.
This section details several contractor license proceedings under the Contract Labour (Regulation and Abolition) Central Rules, 1971, across various regions in India. The proceedings involve obtaining licenses for project sites in different villages and locations within various districts and states. These matters were addressed by different Government of India offices and regional labour commissioners, with various dates spanning from late 2025 to early 2026.
This section primarily lists various registrations and licenses under different insurance and labor laws. Several registrations under the Employees’ Provident Fund and Miscellaneous Provisions Act, 1952, and the Employees’ State Insurance Act, 1948, are mentioned, all of which are noted as cancelled. Furthermore, there are mentions of obtaining Inter-state Migrant Worker Licenses for project sites in specific districts.
This section primarily details various certificates of registration obtained for employers for project sites under the Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Central Rules, 1998, across several states. It also lists numerous other approvals, including Udyam Registration, Import Export Code (IEC), Business Registration Number, and registrations under various Shops and Establishments Acts for Rajasthan.
This section primarily lists various Labour Identification Numbers for different project sites across various locations in different states, all under the Ministry of Labour & Employment notifications. It details the specific Labour Identification Number, the corresponding site location, and the relevant Labour Commissionerate for each site. Additionally, it mentions that the company has applied for the registration of trademarks and a device mark under the Trade Marks Act.
Key points (50)
No outstanding criminal proceedings were found involving the Company, Directors, Promoters, or Group Company. p.272
No actions were initiated by statutory or regulatory authorities involving the Relevant Parties. p.272
No outstanding claims relating to direct and indirect taxes involving the Relevant Parties were found. p.272
No disciplinary actions, including penalties imposed by SEBI or Stock Exchanges against the Promoters in the last five Financial Years, were found. p.272
A civil recovery suit was filed by M/s Kuber Alloys against Goel Construction Co. Pvt. Ltd. and others for Rs. 76,86,896/- with 18% interest. p.272
A petition was filed by M/s Kuber Alloys before the Delhi High Court to set aside an order passed by the Additional District Judge. p.273
A suit for recovery was filed by M/s Goel Construction Company Private Limited against Haryana State Roads and Bridges and Development Corporation Limited for Rs. 10,77,65,723/- related to a construction contract. p.273
An appeal was filed by Goel Construction Company Private Limited challenging an order passed by the Assistant Labour Commissioner, U.P. p.273
Direct Tax proceedings showed 4 cases with a total amount of 0.50 Lakhs. p.275
Outstanding dues to Micro & Small Enterprises amounted to 37,205.37 Lakhs as of March 31, 2025. p.275
Outstanding dues to other creditors amounted to 3,206.69 Lakhs as of March 31, 2025. p.275
A contractor license was processed for a project site in Village-Nigoh Hasanpur, Pragana, Etah, Uttar Pradesh. p.278
A contractor license was processed for a project site in Village-Bhadana, Nagaur, Rajasthan. p.278
A contractor license was processed for a project site in Village - Mohanpura, Tehsil - Kotputli, Jaipur, Rajasthan. p.278
A contractor license was processed for a project site in Village-Sarkipar Post-Semradih, Baloda Bazar, Chhattisgarh. p.278
A contractor license was processed for a project site in Tehsil- Hasanganj, Janpad, Village-Gaura Katherva/Kunjpur, Unnao, Uttar Pradesh. p.278
A contractor license was processed for a project site in Village-Aditya Nagar, Pindwara, Sirohi, Rajasthan. p.278
A contractor license was processed for a project site in Village Bhivgarh Jawangarh, Tehsil- Jaitaran, Pali, Rajasthan. p.278
A contractor license was processed for a project site in Tal- Palsana, Dastan, Surat, Gujarat. p.278
A contractor license was processed for a project site in Village-Tulsigam, Taluka-Desar, District, Vadodara, Gujarat. p.278
Registration under Employees’ Provident Fund was processed with the Regional Provident Fund Commissioner, Karnal, Haryana, and is Valid till Cancelled. p.279
Registration under Employees’ State Insurance was processed with the Regional Office, Employees’ State Insurance Corporation, Jaipur, Rajasthan, and is Valid till Cancelled. p.279
Inter-state Migrant Worker License was required for a project site at Bandhaura, Dist. Singrouli, with a deadline of December 31, 2025. p.279
Inter-state Migrant Worker License was required for a project site at Khasra No 225, Village- Bhadana, with a deadline of September 30, 2025. p.279
Certificate of Registration for Employer for project site at Village Tulsigam, District Vadodara, Gujarat, was obtained under BOCW/RLC/2022/R-124. p.280
Certificate of Registration for Employer for project site at Village Nigoh, Hasanpur, Pragana, Uttar Pradesh, was obtained under BOCW/ALC/KANPUR/20/24/103772/R-23. p.280
Certificate of Registration for Employer for project site at Village Bhivgarh-Jawangarh, Tehsil Jaitaran, Rajasthan, was obtained under BOCW/ALC/AJMER/2024/102363/R-27. p.280
Certificate of Registration for Employer for project site at Village and Post Hirmi, Tehsil Simga, Dist. Balodabazar, Chhattisgarh, was obtained under BOCW/ALC/RAIPUR/2024/100052/R-38. p.280
Certificate of Registration for Employer for project site at Tal Palsana, Dastan, Surat, Gujarat, was obtained under BOCW/RLC/2023/97607/R-106. p.280
Certificate of Registration for Employer for project site at Dist. Singrouli, Madhya Pradesh, was obtained under SING240201/BW000002. p.280
Certificate of Registration for Employer for project site at Village Gaura, Katherva/Kunjpur, Uttar Pradesh, was obtained under BOCW/RLC/2024/98333/R-5. p.281
Certificate of Registration for Employer for project site at Village Gorawat, Khawaspura, Barunda, Tehsil Pipar City, Rajasthan, was obtained under BOCW/ALCJ/ODHPUR/2024/127752/R-64. p.281
Certificate of Registration for Employer for project site at Khasra No. 225, Village Bhadana, Post Padhana, Banaka, Nagaur, Rajasthan, was obtained under BOCW/ALCJ/ODHPUR/2024/106228/R-40. p.281
Certificate of Registration for Employer for project site at Sabarkantha was obtained under DDISH/GNR/BOCWI/429/2023. p.281
Udyam Registration Certificate was obtained under UDYAM-RJ-17-0016414. p.281
Certificate of Import Export Code (IEC) was obtained under 1306018609. p.281
Business Registration Number 1258 was obtained under Companies Act, 1956. p.281
Registration under Punjab Shops and Establishment Act, 1958 was obtained under PSA/REG/HS/R/LI-Hsr-1/0138829. p.281
Registration under Rajasthan Shops and Commercial Establishments Acts, 1958 was obtained under SCA/2024/14/136247. p.281
Labour Identification Number for the Registered Office of the Company is 1-2108-8101-6, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Regional Labour Commissioner, Jaipur. p.282
Labour Identification Number for a project site at Village and Post - Hirmi, Tehsil - Simga Bhatapara, Baloda Bazar-302021, Chhattisgarh, India is 8-5075-2303-1, issued by the Ministry Of Labour and Employment Notification G.S.R. 1125(E) dated November 15, 2018, for the Assistant Labour Commissioner, Raipur. p.282
Labour Identification Number for a project site at 1st Floor, Gram Bandhaura, Singrauli-486886, Madhya Pradesh, India is 1-1118-2560-1, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Regional Labour Commissioner, Bhopal. p.282
Labour Identification Number for a project site at Tal- Palsana, Dastan, Surat-394310, Gujarat, India is 8-2191-6153-4, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Regional Labour Commissioner, Vadodara. p.282
Labour Identification Number for a project site at Village-Bhivgarh- Jawangarh Tehsil- Jaitaran, Pali-306101, Rajasthan, India is 8-7678-5221-7, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Assistant Labour Commissioner, Ajmer. p.282
Labour Identification Number for a project site at Village- Nigoh Hasanpur, Pragana, Etah-207001, Uttar Pradesh, India is 8-6387-4308-5, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Assistant Labour Commissioner, Kanpur. p.282
Labour Identification Number for a project site at Village-Gorawat, Khawaspura, Barunda, Tehsil-Pipar City, Jodhpur-342601, Rajasthan, India is 8-5363-3183-6, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Assistant Labour Commissioner, Jodhpur. p.282
Labour Identification Number for a project site at Khasra No 225, Village-Bhadana, Post-Bhadana Banaka, Nagaur-341001, Rajasthan, India is 8-3816-1247-0, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Assistant Labour Commissioner, Jodhpur. p.282
Labour Identification Number for a project site at Village-Aditya Nagar, Pindwara, Sirohi-307031, Rajasthan, India is 8-8434-0990-2, issued by the Ministry Of Labour and Employment Notification G.S.R.1125(E) dated November 15, 2018, for the Assistant Labour Commissioner, Ajmer. p.283
The company has applied for the registration of a device mark under class 36 and 37 of The Trade Marks Act, 1999. p.283
The company has applied for the registration of a word mark “Goel Construction Company” under classes 36 and 37 of The Trademarks Act, 1999. p.283
Regulatory disclosures
Approvals, licences, and any regulatory actions or compliance matters.
The section details various approvals, compliance confirmations, and eligibility criteria related to the offer. The Board of Directors authorized the offer, and shareholders approved it under the Companies Act, 2013. The selling shareholders confirmed compliance with SEBI ICDR Regulations. The company obtained 'in-principal' approval from BSE for using its name in the Prospectus. Furthermore, the company confirmed compliance with various regulations concerning significant beneficial ownership, market association, and other statutory requirements for the listing process.
The section primarily discusses various legal disclaimers, responsibilities, and compliance statements related to the issuance of the Prospectus. It clarifies that filing the prospectus does not absolve the company of liabilities under the Companies Act, 2013, and reserves the right for SEBI to address irregularities. It details the scope of responsibility between the company, its directors, and the Book Running Lead Manager. Furthermore, it outlines restrictions on who can invest in the offer and specifies the jurisdiction for disputes. The text also includes information regarding the listing of past IPOs handled by the Book Running Lead Manager.
The section details various aspects related to the listing of scrips, the process for handling investor grievances, and the terms of the offer. It mentions that the company is an "Unlisted Issuer" under SEBI ICDR Regulations, and clarifies that no stock market data is available for its equity shares. The company has appointed MUFG Intime India Private Limited as the Registrar to the Offer to manage investor grievances. Furthermore, it outlines the process for applying for offers, including the use of ASBA and UPI payment mechanisms as specified by SEBI circulars. It also details the structure of the Initial Public Offer, including the number of equity shares offered by the company and selling shareholders.
This section details various provisions related to share transfer restrictions, the process for withdrawing an offer, and the timeline for the public offering. It outlines that there are no restrictions on the transfer or transmission of equity shares except for the lock-in of pre-offer capital and certain provisions in the Articles of Association. Furthermore, it specifies procedures for the company to withdraw the offer in consultation with the Book Running Lead Manager, including public notices and subsequent actions for bidders. The section also covers the timeline for the bid/offer period, including opening, closing, and subsequent steps like finalization of the allotment basis and the initiation of refunds.
The section details various aspects related to the listing and trading of securities, including rules set by the BSE and SEBI. It specifies that the shares are proposed to be listed on the SME Platform of BSE Limited, requiring compulsory market making for a minimum of three years. Furthermore, it outlines rules regarding the minimum contract size for trading and the implications of foreign exchange regulations on investment. The text also discusses the allotment structure, including reservations for eligible employees and market makers, and the mode of bidding through the ASBA process.
This section details various terms related to payment, allocation, and offer procedures for public issues, including different investor categories. It outlines rules for anchor investors, eligible employees, and various portions of the offer, such as the QIB portion and the Non-Institutional portion. Furthermore, it discusses rules regarding the allocation of securities, the role of various intermediaries, and the phased implementation of the Unified Payments Interface (UPI) mechanism for payments. It also mentions requirements for bid submission, handling of discrepancies, and investor grievance redressal.
The section details the allocation structure for various investor categories, including QIBs, Mutual Funds, Non-Institutional Investors, and Individual Investors, specifying minimum allocation percentages for different segments of the offer. It outlines rules regarding the allocation of equity shares, including provisions for spill-over allocations between categories, and mandates for how bids must be submitted through various intermediaries and payment mechanisms like ASBA or UPI. Furthermore, it specifies requirements for investor documentation and clarifies restrictions on participation by certain promoter-related entities.
The section details various restrictions and procedures related to participation in the offer, including eligibility criteria for different categories of bidders, rules regarding application sizes, bidding processes, and handling of funds. It outlines specific requirements for individual bidders, non-institutional applicants, QIBs, Anchor Investors, Eligible NRIs, and HUFs. Furthermore, it specifies rules concerning the revision of price bands, the handling of bids, and the necessary documentation and payment mechanisms.
The section details various restrictions and requirements concerning bids from different investor categories, including FPIs, Limited Liability Partnerships, banking companies, SCSBs, insurance companies, and Systemically Important NBFCs. It specifies documentation required for bids from these entities, such as registration certificates, and outlines investment limits and rules based on various regulations like SEBI FPI Regulations, FEMA Rules, and insurance exposure norms. Furthermore, it outlines specific procedures for handling multiple bids and the participation of Anchor Investors and Qualified Institutional Buyers (QIBs).
This section details various requirements and procedures related to bids and applications, primarily concerning different types of entities and funds. It outlines specific documentation required for bids from insurance companies, provident funds, and limited liability partnerships. It also covers processes for receipt and validation of bid data, the collection of funds, and the subsequent allotment process. Furthermore, the text discusses the use of the ASBA process, rules regarding payment mechanisms, and the responsibilities of various intermediaries in the application process.
This section primarily outlines detailed instructions and compliance requirements for investors bidding in the securities market, covering various aspects such as document submission, fund availability, and adherence to regulatory guidelines. It specifies rules regarding bid withdrawal, the necessity of linking PAN with Aadhaar, and procedures for using UPI mechanisms for fund blocking. Furthermore, it details restrictions on bid amounts, the use of different bank accounts, and requirements for documentation related to various investor categories like QIBs and Anchor Investors.
This section details various procedural rules and grounds for technical rejections related to the submission of bids and applications for equity shares. It outlines requirements for bid documentation, timing restrictions for uploads, and various criteria that can lead to the rejection of bids, such as mismatches in identifying numbers or bid amounts, or bids falling outside specified price ranges. Furthermore, it explains the basis for allocation, including how under-subscription in certain categories may be handled through spill-over, and the procedure for allotment to different investor categories.
This section details various rules and procedures related to the allotment process, including different categories like Non-Institutional Bidders and QIBs, and the allocation rules for Anchor Investors. It outlines the flow of events from the closure of the bidding period to the final allotment, including validation of bids and the role of the Designated Stock Exchange. Furthermore, it specifies requirements for submitting bid forms, details for investor accounts, and the rights of the company and selling shareholders regarding the offer.
The Board of Directors certified several conditions regarding the utilization of offer proceeds, requiring funds to be transferred to a separate bank account and details of utilization to be disclosed in the balance sheet. The company committed to comply with SEBI Listing Regulations, 2015 concerning the disclosure and monitoring of these proceeds. Furthermore, the company stipulated that it would not have recourse to the offer proceeds until approval for listing and trading was received. The section also details agreements signed with Depositories for the dematerialized form of equity shares and specifies the ISIN number for the equity shares.
This section primarily defines various terms used within the company's governing documents, such as Independent Directors, Key Managerial Personnel, and different types of meetings. It also outlines provisions related to the company's financial powers, including restrictions on buying its own shares and providing financial assistance for share purchases. Furthermore, the text details the company's authority to buy back securities, the structure of share capital, and the conditions under which new shares can be issued, including provisions for employee stock option schemes and debentures.
This section details various provisions related to the company's share capital, including provisions for the application of Capital Redemption Reserve Account, redemption of preference shares, and the creation of further preference shares. It also outlines powers for the company to reduce its share capital, alter the division, consolidation, and cancellation of shares, and the modification of rights attached to different classes of shares. Furthermore, the text covers rules regarding the issue of certificates, the handling of unclaimed securities, and the conditions under which the company may pay commissions to underwriters.
This section primarily outlines the provisions related to calls made on shares and debentures, including the Board's power to make such calls, the notice period required for calls, and provisions for extensions or postponements. It details how sums due on shares are treated for the purpose of these articles, including the application of interest on unpaid amounts. Furthermore, the text covers the Company's lien on shares and debentures, the procedures for enforcing this lien through the sale of such securities, and the process for forfeiture of shares due to non-payment. It also specifies rules regarding the transfer and transmission of shares, including the requirements for instruments of transfer and the Directors' power to refuse to register such transfers.
This section primarily details the rules surrounding the transfer and registration of securities, including provisions for deceased holders, nominee elections, and the dematerialization of securities. It outlines various rights and liabilities concerning the transfer of shares, including restrictions on certain transfers and the Board's power to withhold payments if notices are not complied with within ninety days. Furthermore, the text covers the maintenance of registers of members and the rules for dealing with securities held in a depository system.
This section details various procedural requirements concerning the calling, notice, and conduct of meetings of the Company, including requirements for notice periods and quorum definitions. It outlines how notices must be served on members, auditors, and directors, and specifies rules for special business and the required explanatory statements to be annexed to the notice. Furthermore, the text covers provisions related to the passing of resolutions via postal ballot and the proper maintenance and recording of minutes from general and board meetings.
This section outlines various procedural and governance rules concerning the company's meetings, director appointments, and director tenure. It details presumptions regarding the validity of meeting minutes, requirements for reporting on annual general meetings, and the Board's responsibility for compliance with laws and regulations related to subsidiaries. Furthermore, the text covers rules for appointing key managerial personnel, limitations on the number of directors, and various provisions related to the appointment, removal, and disqualification of directors.
This section details various provisions related to the conduct of Directors and the Company's contractual dealings. It outlines restrictions on Directors contracting with the Company, the requirement for disclosure of directors' interests in contracts, and rules regarding contracts with related parties. Furthermore, the text covers procedures for entering into certain contracts, such as those with related parties, and the rules for loans and guarantees provided by the Company to directors or other entities. It also specifies procedures for the rotation and appointment of Directors, including the retirement of directors, and the process for filing candidatures for directorship.
This section details the various powers vested in the Board of Directors and the Company, outlining their authority to act on behalf of the company. It specifies powers related to financial matters, such as making calls on shareholders, borrowing money, investing funds, and approving financial statements. Furthermore, the text outlines the Board's authority to take over companies, make political contributions, and appoint key managerial personnel. The section also covers the Directors' powers concerning property acquisition, construction, mortgaging, insuring assets, opening bank accounts, and securing contracts.
This section details various powers and functions granted to the company, including its capacity to handle insolvency matters, manage receipts, invest funds, and provide for the welfare of employees. It outlines the company's ability to subscribe to various funds and its provisions for maintaining pension funds and supporting various institutions. Furthermore, the text covers the power to decide on the allocation of capital and revenue expenditures, create reserve funds, and the authority to appoint officers and delegates. The provisions also touch upon the company's ability to negotiate contracts and make bye-laws for its operations.
This section details various provisions related to dividends, capital, and the handling of shareholder rights. It outlines rules regarding dividend payments, the ability of the Board to declare dividends, and stipulations on how dividends are calculated based on amounts paid-up on shares. Furthermore, it covers procedures for dealing with unpaid dividends, the right of members to waive dividend rights, and the process for capitalizing certain funds into reserves or assets. The text also specifies requirements for maintaining books of accounts, the inspection rights of directors and members, and the procedures for filing financial statements with the Registrar.
This section details various provisions related to the service and delivery of documents, registers, and notices by the company, as well as the material contracts and documents that have been entered into or are planned for entry into the company. It outlines procedures for serving documents on members, directors, and auditors, and specifies the manner in which certain documents must be served or given to ensure proper notice. Furthermore, it lists numerous material contracts, resolutions, financial statements, and various certificates and reports related to an offer or filing process.
The provided section consists entirely of declarations from various directors certifying compliance with relevant provisions of the Companies Act, 2013, and regulations set forth by the Government of India or the Securities and Exchange Board of India. These declarations affirm that all statements made in the Prospectus are true and correct and comply with various acts including the Companies Act, the Securities Contracts (Regulation) Act, 1956, and the Securities and Exchange Board of India Act, 1992. The text includes signed certifications from the Chairman and Managing Director, a Whole-Time Director, an Additional Director, and an Independent Director.
The provided section consists entirely of declarations certifying compliance with various provisions of the Companies Act, 2013, and regulations set forth by the Government of India and the Securities and Exchange Board of India. These declarations are signed by the Director, the Chief Financial Officer, and the Company Secretary & Compliance Officer, affirming that the disclosures in the Prospectus are true and correct and comply with the relevant laws.
Key points (315, showing 60)
The Board of Director(s) authorized the Offer pursuant to a resolution passed on March 05, 2025. p.284
The Shareholders authorized the Offer pursuant to a special resolution passed on March 06, 2025. p.284
The Red Herring Prospectus was approved by the Board vide its resolution in its meeting dated August 22, 2025. p.284
The Selling Shareholder(s) confirmed compliance with the SEBI ICDR Regulations and eligibility for the Offer. p.284
The Company obtained ‘in-principal’ approval from the BSE for using its name in the Prospectus pursuant to an approval letter dated June 20, 2025. p.284
The Company is eligible for the Offer as an ‘Unlisted Issuer’ and an ‘Initial Public Offer’ under the SEBI ICDR Regulations. p.285
The Company was incorporated on June 24, 1997 under the name & style of “Goel Construction Company Private Limited”. p.285
The company satisfies the criteria for the track record of at least three years for listing purposes. p.285
The Company has entered into agreements with NSDL and CDSL for the dematerialization of Equity Shares. p.287
The Book Running Lead Manager is not an associate as defined under the Securities and Exchange Board of India (Merchant Bankers) Regulations, 1992. p.287
The Company is in compliance with the provisions specified in Part A of Schedule VI of the SEBI ICDR Regulations. p.287
The Company confirms that it has operating profits from operations for at least two Financial Years out of the preceding three Financial Years. p.288
The Company has not been referred to the Board for Industrial and Financial Reconstruction (BIFR). p.288
The filing of the prospectus does not relieve the company of liabilities under the Companies Act, 2013. p.289
SEBI reserves the right to address irregularities or lapses in the prospectus. p.289
All legal requirements pertaining to the Offer were complied with at the time of registration with the Registrar of Companies, Jaipur. p.289
The Book Running Lead Manager accepts no responsibility save to the limited extent provided in specific agreements. p.289
Investors applying in the Offer must confirm eligibility under all applicable laws to acquire Equity Shares. p.289
The Draft Red Herring Prospectus was submitted to BSE, and BSE granted permission to use the exchange's name for the proposed listing. p.290
The Equity Shares have not been registered, listed, or otherwise qualified in any other jurisdiction outside India. p.290
The Company has obtained approval from BSE Limited to use the name of BSE Limited in the Prospectus for the listing of Equity Shares on the BSE SME platform. p.291
The scrip of Dharni Capital Services Limited was listed on January 31, 2023. p.293
The Scrip of Kontor Space Limited was listed on October 10, 2023. p.294
The Scrip of Esprit Stones Limited was listed on August 02, 2024. p.294
The Scrip of Sodhani Academy of Fintech Enablers Limited was listed on September 23, 2024. p.294
The Scrip of Popular Foundations Limited was listed on September 24, 2024. p.294
The Scrip of Nexxus Petro Industries Limited was listed on October 04, 2024. p.294
The Scrip of Shri Ahimsa Natutals Limited was listed on April 02, 2025. p.294
The Company has appointed MUFG Intime India Private Limited (Formerly Link Intime India Private Limited) as the Registrar to the Offer to handle investor grievances. p.295
A centralized web-based complaints redress system named “SCORES” was launched by SEBI pursuant to press release no. PR. No. 85/2011 dated June 8th, 2011. p.295
The Initial Public Offer is for 38,8,000 Equity Shares for cash at a price of ₹ 263/- each, aggregating to ₹ 10,007.68/- Lakhs. p.297
The Offer includes a Fresh Offer of 30,84,400 equity shares and an Offer For Sale of 7,23,600 equity shares by Selling Shareholders. p.297
The minimum application size shall be two lots per application provided the minimum application is not less than ₹ 2,0/- per application. p.298
The minimum number of allottees in this Offer was set at 200 shareholders according to SEBI (ICDR) Regulations. p.298
The Board may withhold payment of dividends, bonuses, or other moneys payable in respect of Equity Shares if a nomination notice is not complied with within 90 days. p.299
There are no restrictions on the transfer of Equity Shares except for the lock-in of pre-Offer capital and as provided in the Articles of Association. p.299
The Company reserves the right, in consultation with the BRLM, to not proceed with the Offer and issue a public notice within two days of the Bid/Offer Closing Date, providing reasons. p.299
The Offer is subject to obtaining the final listing and trading approvals of the Stock Exchange and the final RoC approval of the Prospectus after filing. p.299
The Bid/Offer Period is set to open on Tuesday, September 02, 2025, and close on Thursday, September 04, 2025. p.300
The Offer is subject to various provisions related to the duration of the offer period as prescribed by SEBI ICDR Regulations. p.300
The Company shall refund the entire subscription amount received if the 100% subscription is not received within sixty (60) days from the offer closure. p.301
The Company ensured that the number of prospective allottees will not be less than 200. p.301
The Company may migrate to the main board of BSE from the SME Exchange on a later date subject to specific eligibility criteria. p.303
The trading of Equity Shares will happen in a minimum contract size of 400 shares in terms of a specific SEBI circular. p.304
The Allotment of Equity Shares to Non-Residents is subject to conditions prescribed by the Government of India/RBI. p.305
Equity Shares were allotted only in dematerialized form pursuant to Section 29 of the Companies Act, 2013, and trading must be in dematerialized form as per SEBI ICDR Regulations. p.305
The Company is not issuing any new financial instruments through this Offer. p.305
The Offer is being made in terms of Regulation 229 (2) of Chapter IX of SEBI (ICDR) Regulations, 2018, for offers with post-offer paid-up capital exceeding 1,000 lakh rupees and up to 2,500 lakh rupees. p.306
The Offer structure includes reservations for Eligible Employees and designated Market Makers. p.306
The mode of bidding is exclusively through the ASBA process. p.308
The Company may allocate up to 60% of the QIB Portion to Anchor Investors on a discretionary basis in accordance with the SEBI ICDR Regulations, with one-third reserved for domestic Mutual Funds. p.309
An Offer is being made for at least 25% of the post-offer paid-up Equity share capital of the Company under the Book Building Process. p.310
Not less than 35% of the Net Offer shall be available for allocation to Individual Investors who apply for a minimum application size. p.310
Not less than 15% of the Net Offer shall be available for allocation to Non-Institutional Investors, with one-third reserved for bidders with an application size of more than two lots. p.310
Not more than 50% of the Net Offer shall be allotted to QIBs, subject to valid bids being received at or above the Offer Price. p.310
The UPI Mechanism for RIIs applying through Designated Intermediaries was effective from January 1, 2019 until March 31, 2019, and the time duration from public offer closure to listing continued to be six working days. p.313
The UPI Mechanism was implemented in Phase II starting July 1, 2019, and the time duration from public offer closure to listing continued to be six working days. p.313
The UPI Mechanism was introduced in Phase III, which became mandatory for all offers opening on or after December 1, 2023, reducing the time duration from public offer closure to listing to three working days. p.313
All individual investors applying in initial public offerings opening on or after May 1, 2022, where the application amount is up to ₹5 lakh, shall use the UPI Mechanism. p.313
The requirement for the minimum application size shall be above ₹ 2 lakhs. p.313
Who runs and controls the company
Management & board
Directors and senior management: who they are, their background and pay.
The company has six directors on its Board, including one Chairman and Managing Director, two Executive Directors, and three Non-Executive Independent Directors, with one of the Independent Directors being a woman. The document details the particulars of the Board members, including their qualifications, experience, and directorships. Key personnel relationships are disclosed, indicating familial ties between some directors and senior management personnel. Furthermore, the document outlines the terms of appointment and remuneration for the Executive Directors.
The management section details various aspects concerning the company's directors, including remuneration, shareholding, and related party transactions. It outlines sitting fees for Independent and Non-Executive Directors, confirms the absence of a performance-linked bonus or profit-sharing plan for directors, and discusses the deemed interest of directors based on remuneration, sitting fees, and shareholdings. The document also confirms that directors have not been involved in certain regulatory violations and lists recent changes in the Board composition and appointments.
The company has constituted a 'Stakeholders’ Relationship Committee' to address shareholder grievances, which includes resolving various issues such as share transfers, dividend receipts, and adherence to service standards. Key Managerial Personnel (KMP) and Senior Management Personnel (SMP) details are provided, including appointments and designations. Several individuals have been appointed or re-appointed as directors or in senior roles, with various dates for such changes being disclosed. The company confirms that no service contracts, contingent or deferred compensation, or employee stock option schemes are in place for KMP and SMPs. Furthermore, the company commits to complying with Insider Trading regulations and has established a code of conduct for employees.
The provided text snippet is a heading indicating the section dedicated to the Management Organisation Structure within the company's documents.
Key points (33)
The Board of Directors is composed of six members: one Chairman and Managing Director, two Executive Directors, and three Non-Executive Independent Directors. p.184
Mr. Mahesh Chandra Agrawal is an Independent Director and has extensive experience in the dairy and food industries. p.187
Ms. Sakshi Agarwal is an Independent Director with a background in business and consultancy. p.187
Mr. Chaman Lal is an Independent Director with 33 years of service in the Haryana Government. p.187
Mrs. Soni Goel is an Additional Director (Executive) and has experience in procurement and business administration. p.187
The relationship section discloses familial ties between several Directors and Key Managerial Personnel. p.187
Mrs. Soni Goel was employed as Procurement Manager and received a salary of ₹20.00 lakhs during FY 2024-25, but no remuneration was paid to her as a Director during that financial year. p.189
Independent Directors and Non-Executive Directors are entitled to receive a sitting fee of ₹ 15,000 per meeting for attending various Committee and Board meetings. p.189
The Company does not have any performance linked bonus or profit-sharing plan for its Directors. p.189
Directors may be deemed to be interested in transactions based on remuneration, sitting fees, or shareholdings held in the company or associated entities. p.189
No loans have been availed or extended by the directors from or to the Company, except as stated in specific sections. p.189
No proceedings or investigations have been initiated by SEBI against any company where the Board of Directors comprises any of the Directors. p.190
Mr. Vijay Kumar Goel was appointed to the Board of Directors on July 01, 2023 and later re-appointed as Whole-Time Director. p.190
Mr. Purushottam Dass Goel was re-appointed as Whole-Time Director for a further period of 3 years starting April 01, 2024. p.190
Mr. Purushottam Dass Goel was Shareholders Re-appointed as Chairman and Managing Director on September 30, 2024. p.190
Mr. Satish Goel's Directorship was ceased on December 16, 2024 as Whole-Time Director. p.190
Mr. Mahesh Agarwal was appointed as an Additional Director - Independent on December 16, 2024. p.190
Mr. Chaman Lal was appointed as an Additional Director - Independent on March 05, 2025. p.190
Mr. Mahesh Agarwal was Regularised as Independent Director on March 06, 2025. p.190
The Audit Committee comprises Mr. Mahesh Chandra Agrawal (Chairman Independent Director), Ms. Sakshi Agarwal (Member Independent Director), and Mr. Purushottam Dass Goel (Member Managing Director). p.191
The Nomination and Remuneration Committee comprises Mr. Chaman Lal (Chairman Independent Director), Ms. Sakshi Agarwal (Member Independent Director), and Mr. Mahesh Chandra Agrawal (Member Independent Director). p.193
The Stakeholders’ Relationship Committee was constituted by a resolution passed at the Board of Directors meeting on March 12, 2025. p.194
Ms. Sakshi Agarwal is an Independent Director and Chairman of the Stakeholders’ Relationship Committee. p.194
Mr. Purushottam Dass Goel is a Member of the Stakeholders’ Relationship Committee and a Managing Director. p.194
Mr. Chaman Lal is an Independent Director on the Stakeholders’ Relationship Committee. p.194
Mr. Purushottam Dass Goel was appointed as a Promoter, Chairman cum Managing Director and was re-appointed as Whole-Time Director by the Board of Directors on March 27, 2024. p.195
Mr. Natwar Lal Ladha is the Chief Financial Officer and was appointed to the post by a Board resolution dated November 30, 2024. p.195
Ms. Surbhi Maloo was appointed as Company Secretary and Compliance Officer by a Board Resolution dated December 24, 2024. p.195
No contingent or deferred compensation is payable to any of the Key Managerial Personnel and Senior Managerial Personnel. p.196
Mr. Amit Goel was designated as Project Head and Senior Managerial Personnel by a Board resolution dated March 05, 2025. p.196
Mr. Pawan Kumar Patel was designated as Senior Managerial Personnel by a Board resolution dated March 05, 2025. p.196
The Company will comply with the requirements of the SEBI (Prohibition of Insider Trading) Regulations, 2015 upon listing on the SME Platform of BSE Limited. p.198
The section covers the structure of the management organization. p.199
Promoters
The people or entities controlling the company, and what else they own.
The company has a group of promoters, including Mr. Purushottam Dass Goel, who serves as the Chairman and Managing Director. The list also includes several other promoters, and details regarding their shareholding are available in the 'Capital Structure' section starting on page 74. The document details the personal and professional profiles of several individuals within the promoter group.
The section introduces three individuals as Promoters of the Company: Mrs. Isha Goel, Mrs. Nirmala Goel, and Mrs. Suman Goel, detailing their personal information, including age, date of birth, address, permanent account numbers, education, and professional experience. The text also lists numerous individuals who are identified as promoters, including Mr. Purushottam Dass Goel, Mr. Arun Kumar Goel, and others, noting that some former promoters have ceased to be promoters due to requests for name removal following the cessation of directorship and share transfers. Furthermore, the text outlines various provisions regarding the interest of promoters, related party transactions, and undertakings concerning the non-payment of amounts to promoters.
This section lists various individuals who are related to the promoters, including spouses, brothers, and sisters, across different family lines. It also details a list of entities that form part of the Promoter Group based on shareholding criteria, including various proprietorships and LLPs. Furthermore, the document outlines the criteria for identifying 'group companies' and clarifies that the company currently has no group companies as defined by the regulations. Finally, it discusses the company's dividend policy, stating that dividend payments depend on various factors and that the company has not declared or paid dividends in the preceding three financial years.
This section details the Independent Auditor Examination Report on restated financial information for Goel Construction Company Limited, covering financial statements for the years ended March 31, 2025, 2024, and 2023. The report confirms that the financial information was prepared in accordance with various regulations, including the Companies Act, ICDR Regulations, and ICAI Guidance Notes. The examination relied on audit reports from the company's predecessor auditors, and the management prepared the information based on audited financial statements. The report concludes that the restated financial information incorporates necessary adjustments and complies with the relevant legal and regulatory frameworks.
This section provides details regarding the financial statements and the individuals associated with the company, Goel Construction Company Limited. It includes a cash flow statement summary, details about the auditors, and information on the ownership structure of the company. The financial information was prepared for inclusion in the Red Herring Prospectus and approved by the directors for an Initial Public Offering (IPO).
The provided text details various financial balances, including reserves, borrowings, provisions, and assets/liabilities, but it does not explicitly identify individual promoters, their shareholding percentages, or any specific adverse regulatory actions against them. The data focuses on balance sheet movements and loan details.
This section details various financial and operational aspects of the company, including investments, receivables, inventories, cash flows, and expenses over several fiscal years. Key financial data includes investments in mutual funds and equity shares of other companies, as well as various trade receivables and inventory movements. The data also covers cash and bank balances, various loans, revenue from operations, and detailed breakdowns of costs, employee benefits, finance costs, and other operating expenses.
This section details various financial and operational data, including expenses, profit figures, and earning per share calculations for the company. It also outlines contingent liabilities, such as counter guarantees and GST-related matters, and provides information on related party transactions. The data includes details on various directors, their associated entities, and the nature of transactions conducted with related parties during the financial years ending March 31, 2025, 2024, and 2023.
The provided section details various transactions with related parties during the year ended March 31, 2023, listing numerous individuals and entities involved. The section also includes disclosures regarding employee benefits, such as Provident Fund and ESIC contributions, and various analytical ratios. Furthermore, it contains numerous compliance notes related to the company's financial reporting, such as the absence of certain property holdings, transactions with struck-off companies, and details on Corporate Social Responsibility (CSR) spending.
This section details various financial and accounting ratios, including profit after tax, earnings before interest, tax, and depreciation, as well as metrics related to the company's net worth and asset structure. It also provides information on the company's borrowings, specifically listing details of secured loans from HDFC BANK, including the amount outstanding, sanction dates, disbursement dates, interest rates, and prepayment conditions.
This section primarily details various loan agreements, mainly term loans from HDFC Bank, concerning the purchase of CEMID equipment and vehicle loans. The details cover different loan amounts, dates, and specific penalty structures for premature full payment, which vary depending on the time elapsed since the first EMI. Several agreements are scheduled to mature in 2026, while others have maturity dates extending to 2027. Additionally, there is mention of a term loan from Axis Bank Limited for CEMID equipment, which involves foreclosure and part prepayment charges.
This section details various financial arrangements, primarily revolving around term loans and equipment purchases from Axis Bank Limited and HDFC Bank. Several clauses specify foreclosure charges, such as 5% of the principal plus GST, for certain facilities. HDFC Bank term loans for vehicle purchases have provisions for premature full payment penalties, with charges varying based on the time elapsed since the first EMI, ranging from 2% to 5% on the principal outstanding. Furthermore, there are specific provisions for part prepayment penalties for some of these loans.
This section details various terms related to premature part or full payment on HDFC Bank Term Loans for the purchase of CEMID equipment. The terms vary based on the time frame: for premature payment within 12 months from the first EMI, the interest rate is 4% on the principal outstanding, while for payments exceeding 12 months from the first EMI, the rate is 2% on the principal outstanding. The text lists several instances where these payment terms were applied, with different loan amounts and maturity dates.
This section details various term loans and credit facilities availed by the company from HDFC Bank, primarily concerning the purchase of CEMID equipment. The records show different loan amounts, dates, and maturity periods, with various stipulations regarding premature full payment. Several entries relate to different loan tenures and repayment terms, and there is also a mention of a Bank of Baroda Overdraft facility. The total utilized loans are also disclosed.
The section details various unsecured loans extended to the company by different directors and others, with the total outstanding amount being ₹69.43 Lakhs as of July 31, 2025. The loans are categorized into 'Loans and Advances from Directors' and 'Loans and Advances from Others,' listing specific amounts for Purushottam Dass Goel, Arun Kumar Goel, Soni Goel, and several others. The text also confirms that the company has not defaulted on any loan installments or interest payments in the past three financial years.
This section details various financial performance metrics, including revenue, income, expenses, and profit figures across different financial years. Revenue from Construction Works showed a significant increase, while Other operating revenue decreased. Total expenses rose, driven by increases in material costs, employee benefits, and other operational costs. Profit before tax and after tax also showed substantial growth, with corresponding increases in tax expenses. The section also provides cash flow summaries from operating, investing, and financing activities, along with details on financial indebtedness and potential events of default from lenders.
The provided text details various financial and regulatory matters, including counter guarantees, GST issues, TDS demands, and labour disputes, with various resolutions or pending replies from the GST department. It also mentions that the company has faced penalties that have been quashed by the courts. Furthermore, the text discusses aspects related to the dependence on suppliers and customers, showing significant reliance on a small number of key entities for both purchases and revenue.
Key points (111, showing 60)
Mr. Purushottam Dass Goel is a Promoter, Chairman, and Managing Director of the Company. p.200
Mr. Arun Kumar Goel is a Promoter and Whole-Time Director of the Company. p.200
Mr. Naresh Kumar Goel has experience in finance, accounting, and business management, and has directorships in M/s. City Buildtech Private Limited, M/s. Greentech Mega Food Park Limited, and M/s. Satya Prakash Builders Private Limited. p.201
Mr. Ratan Kumar Goel is the Promoter and Senior Management Personnel of the Company, with 19 years of experience in the construction industry and no other directorships. p.201
Mrs. Soni Goel is an Additional Director (Executive) and Promoter of the Company, with 14 years of experience in the construction industry and no other directorships. p.204
Mrs. Isha Goel is the Promoter of the Company, aged 41 years, with a date of birth on October 29, 1983, and 14 years of experience in the construction industry. p.205
Mrs. Nirmala Goel is the Promoter of the Company, aged 63 years, with no specified experience, and her business activity is listed as Housewife. p.205
Mr. Purushottam Dass Goel, Mr. Arun Kumar Goel, and Mr. Vijay Kumar Goel were the original Promoters of the Company, and Mr. Satish Goel was also classified as a Promoter. p.206
Mr. Vijay Kumar Goel and Mr. Satish Kumar ceased to be Promoters due to requests for removal of their names following the cessation of directorship and transfer of shares. p.206
A list of individuals including Mr. Purushottam Dass Goel, Mr. Arun Kumar Goel, Mr. Naresh Kumar Goel, Mr. Ratan Kumar Goel, Mr. Amit Goel, Mr. Anuj Goel, Mr. Ashwani Goel, Mr. Chinmay Goel, Mr. Mohak Goel, Mrs. Soni Goel, Mrs. Isha Goel, Mrs. Nirmala Goel, and Mrs. Suman Goel have been identified and classified as promoters. p.206
The Promoters are interested in the company to the extent of their interest in promotion, shareholding, dividends, distributions, directorships, and remuneration payable to them as Directors or Senior Management Personnel. p.206
No payment of any amount or benefit was made to the Promoters or Promoter Group during the two years preceding the filing date, nor is there any intention to pay such amounts. p.206
Several companies or firms with which the Promoters have disassociated in the last three years include Royal Ensign Realtech Private Limited, Ganpati Builders, Goel Construction Private Limited, and Goel Construction Private Limited. p.207
Except for Mr. Naresh Kumar Goel, Mrs. Nirmala Goel, and Mrs. Suman Goel, all other Promoters have experience in the line of business in which the Company operates. p.207
Promoters have not given any material guarantees to any third party in respect of the Equity Shares as of the date of the Prospectus. p.207
There have been no violations of securities laws committed by the Promoter and members of the Promoter Group in the past, and no proceedings for violation of securities laws are pending against them. p.207
The Promoters and members of the Promoter Group have not been declared as Wilful Defaulters or Fraudulent Borrowers by any bank or financial institution. p.207
The Promoters have not been debarred from accessing the capital market by SEBI or any other regulatory or governmental authorities. p.207
The Promoters have not been declared as a fugitive economic offender under section 12 of the Fugitive Economic Offender Act, 2018. p.207
There are no defaults in respect to the payment of interest and principal to debenture/bond/fixed deposit holders by the Company, the Promoter, and the Company promoted by the promoter during the past three years. p.207
Various individuals and entities form part of the Promoter Group as defined by Regulation 2(1)(pp) of the SEBI ICDR Regulations, including relatives of the original promoters. p.208
A list of individuals is provided, including the spouse's mother, the spouse's brother, and the spouse's sister for several individuals. p.210
A list of individuals is provided, including the father, mother, spouse, and various brothers and sisters. p.210
A list of entities forming part of the Promoter Group is detailed, including various proprietorships, HUFs, and companies. p.211
A list of body corporates in which at least 20% of the equity share capital is held by the Promoter Group is listed. p.211
The definition of 'group companies' is provided, including companies with which the Offer company had related party transactions or companies considered material by the Board. p.212
The company does not have any group companies as on the date of this Prospectus. p.212
The dividend policy states that the ability to pay dividends depends on factors such as capital expenditure, profit, working capital requirements, and economic environment. p.213
The company has not declared and paid any dividends on the Equity Shares in any of the three financial years preceding the date of this Prospectus. p.213
The Restated Financial Information was prepared in terms of the requirements of Section 26 of Part I of Chapter III of the Companies Act, 2013 read with Companies (Prospectus and Allotment of Securities) Rules 2014. p.215
The Restated Financial Information was prepared in terms of the Securities and Exchange Board of India (Issue of Capital and Disclosure Requirements) Regulations, 2018, as amended (ICDR Regulations). p.215
The Restated Financial Information was prepared in accordance with the Guidance Note on Reports in Company Prospectuses (Revised 2019) issued by the Institute of Chartered Accountants of India (ICAI). p.215
The management prepared the Restated Financial Information based on the 'Basis of Preparation of Restated Financial Information' note stated in Note 2 of the Notes to the Restated Financial Information. p.215
The examination relied on Audited financial statements of the company as at and for the year ended March 31, 2025, prepared in accordance with Indian Generally Accepted Accounting Principles (Indian GAAP). p.215
The examination relied on Audited Financial Statements of the company as at and for the years ended March 31, 2024 and March 31, 2023, prepared in accordance with Indian GAAP. p.215
Reliance was placed on the Auditor report issued by the examining firm dated July 30, 2025 on the financial statements of the company as at and for the year ended March 31, 2025. p.216
Reliance was placed on the Auditor Report issued by the predecessor auditor A Bafna & Co. dated September 02, 2024 for the financial statements of the company for the year ended March 31, 2024. p.216
Reliance was placed on the Auditor Report dated August 30, 2023 issued by predecessor Auditor Akar & Associates on the financial statements of the company as at and for the year ended March 31, 2023. p.216
The audit reports on the financial statements issued by the examining firm and the predecessor auditor were unmodified and unqualified. p.216
The financial information has been prepared based on the Balance Sheet as of March 31, 2025, 2024, and 2023, along with related statements and accounting policies. p.220p.221
Paras Bhatia Purushottam Dass Goel, along with other individuals, are listed as partners, Chairman & Managing Director, and Whole-Time Director. p.220
The financial information was prepared for inclusion in the Red Herring Prospectus (RHP) and approved by the directors for an IPO on the BSE SME platform. p.221
The company has issued bonus shares on March 12, 2025, in the ratio of 10 shares for every 1 share held, resulting in the issuance of 1,03,32,000 shares. p.223
Purushottam Dass Goel held 35.84% of the equity shares as of March 31, 2025. p.223
Arun Kumar Goel held 12.99% of the equity shares as of March 31, 2025. p.223
Vijay Kumar Goel ceased to be a promoter and resigned as a director on the same date for FY 23-24. p.223
The total number of equity shares outstanding as of March 31, 2025, was 1,13,65,200. p.223
Secured borrowings from banks include a Term Loan and Secured Borrowing. p.225
Loans and advances from related parties include amounts from both Relatives and Directors. p.225
Loans taken during the year were guaranteed by the director of the company, and these loans were secured through the hypothecation of assets. p.225
Loans are primarily secured by hypothecation of debtors, FD, FD for FDOD, with a second charge as a collateral security by way of Equitable Mortgage of specific properties. p.225
The company has obtained term loans and vehicles loans from banks for the purpose of respective Equipment and Vehicle financing, and these borrowings were used for the stated purposes. p.225p.226
The company held 15,50,000 Equity Shares of Green Wings Innovative Finance Pvt. Ltd. as of a certain date. p.230
The company had invested in 6,000 Equity Shares of Jai Shree Realtech Pvt. Ltd. p.230
The company had an investment as a partner in Durva Infratech LLP, which was retired in terms of a revised LLP agreement. p.230
A total of 4,50,000 shares were allotted by Green Wings Innovative Finance Pvt. Ltd. at Rs. 14 per share. p.230
The company has retired from M/s Durva Infratech LLP and received back the amount invested. p.230
Trade receivables (Secured considered good) stood at 2,776.79 as of March 31, 2025. p.231
Gross Revenue From Construction Works for the year ended March 31, 2025, was 69,515.12. p.232
Total Cash and Bank Balance as of March 31, 2025, was 5,540.30. p.232
Updates since the first filing
Addenda, corrigenda and the abridged prospectus, newest first.
No amendments or updates have been filed yet. They will appear here as SEBI publishes them, on this same page.
Goel Construction Company Limited IPO: common questions
Short answers drawn from the filings above.
How big is the Goel Construction Company Limited IPO?
Goel Construction Company Limited's IPO comprises a fresh issue of 30,84,400 shares and an offer for sale of 7.24 lakh shares, according to its Prospectus. The price band was ₹250.00 to ₹263.00 per share and the final offer price was ₹263.00 per share.
What are Goel Construction Company Limited's revenue and profit?
Goel Construction Company Limited reported revenue from operations of ₹590 Cr in FY25, +52.8% versus FY24. Net profit was ₹38 Cr (FY24: ₹23 Cr). Revenue grew at a compound rate of 47.6% a year from FY23 to FY25. Figures are read from the Prospectus, as printed there.
How much do promoters own in Goel Construction Company Limited?
Promoters and the promoter group hold 97.3% of Goel Construction Company Limited before the IPO.
How will Goel Construction Company Limited use the IPO money?
The fresh-issue proceeds are earmarked for: Capital expenditure towards purchase of additional equipments and fleets (₹42 Cr); Repayment / prepayment of certain outstanding borrowings availed by our Company (₹23 Cr); General corporate purposes (₹9.7 Cr). The offer-for-sale portion goes to the selling shareholders, not the company.
What are the red flags in Goel Construction Company Limited's Prospectus?
We fact-checked 38 claims from the filing against the open web: 0 raised a high concern, 0 medium and 0 low. This is an automated screen, not a verdict; each finding links to its sources.
What does Goel Construction Company Limited do?
Forget the hype: there is zero verifiable record confirming that Mr. Satish Goel was re-appointed as Whole-Time Director for another three years starting in April 2024. This silence surrounding a key directorial appointment raises serious questions about the governance and transparency surrounding the recent IPO of…
Who manages the Goel Construction Company Limited IPO?
Book running lead managers: Srujan Alpha Capital Advisors LLP. Registrar to the offer: MUFG Intime India Private Limited. Shares are proposed to list on BSE.
Where can I read the original Goel Construction Company Limited IPO documents?
All 1 filing for Goel Construction Company Limited (Prospectus) are listed on this page with links to the original PDFs on SEBI's website. Every page reference cites the exact page of the source document.
Source documents
Every page reference on this site links to the original SEBI PDF.